[미국특허]
Construction machine hydraulic drive system having exhaust gas purifying device
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
F01N-003/00
F01N-003/023
F02D-029/04
F02D-041/02
F02D-041/40
E02F-009/20
E02F-009/22
F15B-015/18
E02F-003/32
F01N-009/00
F01N-003/025
출원번호
US-0237357
(2012-10-02)
등록번호
US-9080481
(2015-07-14)
우선권정보
JP-2011-220453 (2011-10-04)
국제출원번호
PCT/JP2012/075493
(2012-10-02)
국제공개번호
WO2013/051551
(2013-04-11)
발명자
/ 주소
Takebayashi, Yoshifumi
Takahashi, Kiwamu
Mori, Kazushige
Nakamura, Natsuki
출원인 / 주소
HITACHI CONSTRUCTION MACHINERY CO., LTD.
대리인 / 주소
Mattingly & Malur, PC
인용정보
피인용 횟수 :
2인용 특허 :
0
초록▼
A construction machine hydraulic drive system that performs load sensing control is capable of efficiently burning and removing deposits on a filter in an exhaust gas purifying device through pump output increasing control and to be free from faults in the pump output increasing control even when an
A construction machine hydraulic drive system that performs load sensing control is capable of efficiently burning and removing deposits on a filter in an exhaust gas purifying device through pump output increasing control and to be free from faults in the pump output increasing control even when an actuator is operated during the pump output increasing control. A solenoid switching valve is switched so that output pressure of an engine speed detecting valve is guided to a pressure receiving portion of an LS control valve and a pressure receiving portion of an unloading valve when a start of regeneration is not directed, and delivery pressure of a pilot pump is guided to the pressure receiving portion and the pressure receiving portion when the start of the regeneration is directed, to thereby disable load sensing control to increase capacity of a main pump and increase set pressure of the unloading valve.
대표청구항▼
1. A construction machine hydraulic drive system comprising: an engine;a variable displacement hydraulic pump driven by the engine;a plurality of actuators driven by hydraulic fluid delivered from the hydraulic pump;a plurality of flow and directional control valves that control a flow rate of the h
1. A construction machine hydraulic drive system comprising: an engine;a variable displacement hydraulic pump driven by the engine;a plurality of actuators driven by hydraulic fluid delivered from the hydraulic pump;a plurality of flow and directional control valves that control a flow rate of the hydraulic fluid supplied from the hydraulic pump to the actuators;a pump control device including: a torque control section that performs absorption torque maintaining control that prevents absorption torque of the hydraulic pump from exceeding a predetermined maximum torque by reducing a capacity of the hydraulic pump as a delivery pressure of the hydraulic pump increases; and a load sensing control section that performs load sensing control that ensures that the delivery pressure of the hydraulic pump is higher than maximum load pressure of the actuators by a target differential pressure;an unloading valve connected to a line to which a delivery fluid from the hydraulic pump is guided, the unloading valve opening when the delivery pressure of the hydraulic pump is higher than a sum of the maximum load pressure and an unloading set pressure, to thereby return the delivery fluid of the hydraulic pump to a tank, thus restricting an increase in the delivery pressure of the hydraulic pump; anda pilot pump driven by the engine;an exhaust gas purifying device that purifies exhaust gases from the engine;an instruction device that directs a start of regeneration of the exhaust gas purifying device; anda changeover control device that selects to enable or disable the load sensing control performed by the load sensing control section by enabling the load sensing control of the load sensing control section when the instruction device does not direct a start of the regeneration of the exhaust gas purifying device and disabling the load sensing control of the load sensing control section when the instruction device directs the start of the regeneration of the exhaust gas purifying device to thereby increase the capacity of the hydraulic pump,wherein the disabling of the load sensing control by the changeover control device includes guiding a predetermined pressure generated based on the delivery fluid of the pilot pump to the unloading valve to thereby increase the unloading set pressure. 2. The construction machine hydraulic drive system according to claim 1, further comprising: a pilot hydraulic source connected to the pilot pump, the pilot hydraulic source generating a pilot primary pressure based on the delivery fluid of the pilot pump; andan engine speed detecting valve disposed between the pilot pump and the pilot hydraulic source, the engine speed detecting valve generating a hydraulic signal dependent on a speed of the engine based on the delivery fluid of the pilot pump, whereinthe load sensing control section of the pump control device includes an LS a load sensing control valve that includes a first pressure receiving portion to which the hydraulic signal of the engine speed detecting valve is guided, the first pressure receiving portion being operative in a direction in which pump capacity increases to thereby set target differential pressure of the load sensing control using the hydraulic signal,wherein the unloading valve includes a spring operative in a closing direction and a pressure receiving portion operative in a closing direction to cooperate with the spring and set an unloading set pressure, andwherein the changeover control device guides the hydraulic signal generated by the engine speed detecting valve to the pressure receiving portion of the unloading valve when the instruction device does not direct the start of the regeneration of the exhaust gas purifying device, and guides the delivery pressure of the pilot pump to the pressure receiving portion of the unloading valve as the predetermined pressure when the instruction device directs the start of the regeneration of the exhaust gas purifying device. 3. The construction machine hydraulic drive system according to claim 2, further comprising: a differential pressure reducing valve that generates and outputs differential pressure between the delivery pressure of the hydraulic pump and the maximum load pressure, with the hydraulic pressure of the pilot hydraulic source as a primary pressure, as an absolute pressure to the pump control device, whereinthe LS control valve further includes a second pressure receiving portion operative in a direction in which the pump capacity decreases, the second pressure receiving portion receiving the absolute pressure output from the differential pressure reducing valve guided thereto, andwhen the instruction device directs the start of the regeneration of the exhaust gas purifying device, the changeover control device guides the delivery pressure of the pilot pump instead of the hydraulic signal of the engine speed detecting valve to the first pressure receiving portion of the LS control valve to thereby disable the load sensing control, thus controlling to increase the capacity of the hydraulic pump. 4. The construction machine hydraulic drive system according to claim 3, wherein the changeover control device includes a single switching valve that changes a position thereof so that, when the instruction device does not direct the start of the regeneration of the exhaust gas purifying device, the hydraulic signal of the engine speed detecting valve is guided to the first pressure receiving portion of the LS control valve and the pressure receiving portion of the unloading valve and, when the instruction device directs the start of the regeneration of the exhaust gas purifying device, the delivery pressure of the pilot pump is guided to the first pressure receiving portion of the LS control valve and the pressure receiving portion of the unloading valve. 5. The construction machine hydraulic drive system according to claim 1, further comprising: a pressure detecting device that detects exhaust resistance in the exhaust gas purifying device, whereinthe instruction device directs the start of the regeneration of the exhaust gas purifying device when the exhaust resistance of the exhaust gas purifying device detected by the pressure detecting device exceeds a threshold value. 6. The construction machine hydraulic drive system according to claim 1, wherein the torque control section of the pump control device is configured so as to control the capacity of the hydraulic pump so that, with characteristics set in advance, the characteristics indicating a relation between the delivery pressure and the capacity of the hydraulic pump and comprising a maximum capacity maintaining characteristic and a maximum absorption torque maintaining characteristic, when the delivery pressure of the hydraulic pump is equal to, or lower than, a first value as a pressure at a transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic, the maximum capacity of the hydraulic pump is made to remain constant even when the delivery pressure of the hydraulic pump increases, and when the delivery pressure of the hydraulic pump increases to exceed the first value, the maximum capacity of the hydraulic pump decreases according to the maximum absorption torque maintaining characteristic, andthe predetermined pressure is set so that a sum of the unloading set pressure of the unloading valve increased by the predetermined pressure and pressure generated by an override characteristic of the unloading valve is a value equal to, or greater than, a pressure near the transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic. 7. The construction machine hydraulic drive system according to claim 2, further comprising: a pressure detecting device that detects exhaust resistance in the exhaust gas purifying device, whereinthe instruction device directs the start of the regeneration of the exhaust gas purifying device when the exhaust resistance of the exhaust gas purifying device detected by the pressure detecting device exceeds a threshold value. 8. The construction machine hydraulic drive system according to claim 3, further comprising: a pressure detecting device that detects exhaust resistance in the exhaust gas purifying device, whereinthe instruction device directs the start of the regeneration of the exhaust gas purifying device when the exhaust resistance of the exhaust gas purifying device detected by the pressure detecting device exceeds a threshold value. 9. The construction machine hydraulic drive system according to claim 4, further comprising: a pressure detecting device that detects exhaust resistance in the exhaust gas purifying device, whereinthe instruction device directs the start of the regeneration of the exhaust gas purifying device when the exhaust resistance of the exhaust gas purifying device detected by the pressure detecting device exceeds a threshold value. 10. The construction machine hydraulic drive system according to claim 2, wherein the torque control section of the pump control device is configured so as to control the capacity of the hydraulic pump so that, with characteristics set in advance, the characteristics indicating a relation between the delivery pressure and the capacity of the hydraulic pump and comprising a maximum capacity maintaining characteristic and a maximum absorption torque maintaining characteristic, when the delivery pressure of the hydraulic pump is equal to, or lower than, a first value as a pressure at a transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic, the maximum capacity of the hydraulic pump is made to remain constant even when the delivery pressure of the hydraulic pump increases, and when the delivery pressure of the hydraulic pump increases to exceed the first value, the maximum capacity of the hydraulic pump decreases according to the maximum absorption torque maintaining characteristic, andthe predetermined pressure is set so that a sum of the unloading set pressure of the unloading valve increased by the predetermined pressure and pressure generated by an override characteristic of the unloading valve is a value equal to, or greater than, a pressure near the transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic. 11. The construction machine hydraulic drive system according to claim 3, wherein the torque control section of the pump control device is configured so as to control the capacity of the hydraulic pump so that, with characteristics set in advance, the characteristics indicating a relation between the delivery pressure and the capacity of the hydraulic pump and comprising a maximum capacity maintaining characteristic and a maximum absorption torque maintaining characteristic, when the delivery pressure of the hydraulic pump is equal to, or lower than, a first value as a pressure at a transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic, the maximum capacity of the hydraulic pump is made to remain constant even when the delivery pressure of the hydraulic pump increases, and when the delivery pressure of the hydraulic pump increases to exceed the first value, the maximum capacity of the hydraulic pump decreases according to the maximum absorption torque maintaining characteristic, andthe predetermined pressure is set so that a sum of the unloading set pressure of the unloading valve increased by the predetermined pressure and pressure generated by an override characteristic of the unloading valve is a value equal to, or greater than, a pressure near the transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic. 12. The construction machine hydraulic drive system according to claim 4, wherein the torque control section of the pump control device is configured so as to control the capacity of the hydraulic pump so that, with characteristics set in advance, the characteristics indicating a relation between the delivery pressure and the capacity of the hydraulic pump and comprising a maximum capacity maintaining characteristic and a maximum absorption torque maintaining characteristic, when the delivery pressure of the hydraulic pump is equal to, or lower than, a first value as a pressure at a transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic, the maximum capacity of the hydraulic pump is made to remain constant even when the delivery pressure of the hydraulic pump increases, and when the delivery pressure of the hydraulic pump increases to exceed the first value, the maximum capacity of the hydraulic pump decreases according to the maximum absorption torque maintaining characteristic, andthe predetermined pressure is set so that a sum of the unloading set pressure of the unloading valve increased by the predetermined pressure and pressure generated by an override characteristic of the unloading valve is a value equal to, or greater than, a pressure near the transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic. 13. The construction machine hydraulic drive system according to claim 5, wherein the torque control section of the pump control device is configured so as to control the capacity of the hydraulic pump so that, with characteristics set in advance, the characteristics indicating a relation between the delivery pressure and the capacity of the hydraulic pump and comprising a maximum capacity maintaining characteristic and a maximum absorption torque maintaining characteristic, when the delivery pressure of the hydraulic pump is equal to, or lower than, a first value as a pressure at a transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic, the maximum capacity of the hydraulic pump is made to remain constant even when the delivery pressure of the hydraulic pump increases, and when the delivery pressure of the hydraulic pump increases to exceed the first value, the maximum capacity of the hydraulic pump decreases according to the maximum absorption torque maintaining characteristic, andthe predetermined pressure is set so that a sum of the unloading set pressure of the unloading valve increased by the predetermined pressure and pressure generated by an override characteristic of the unloading valve is a value equal to, or greater than, a pressure near the transition point from the maximum capacity maintaining characteristic to the maximum absorption torque maintaining characteristic.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.