System for tracking and testing generator sets used in conjunction with temperature controlled containers
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
B60H-001/32
G01M-099/00
F25D-029/00
B60H-001/00
B60P-003/20
F25D-011/00
출원번호
US-0708377
(2012-12-07)
등록번호
US-9310279
(2016-04-12)
발명자
/ 주소
Crombie, Dermott C.
Stark, Michael
Eslinger, Arlo G.
Burnham, Randall S.
출원인 / 주소
THERMO KING CORPORATION
대리인 / 주소
Hamre, Schumann, Mueller & Larson P.C.
인용정보
피인용 횟수 :
1인용 특허 :
15
초록▼
A generator set system for use with a refrigerated shipping container, the generator set system including a prime mover, a generator coupled to the prime mover, a generator set controller, and a generator set telematics unit. The generator set telematics unit determines a geographical location of th
A generator set system for use with a refrigerated shipping container, the generator set system including a prime mover, a generator coupled to the prime mover, a generator set controller, and a generator set telematics unit. The generator set telematics unit determines a geographical location of the generator set, and the generator set controller performs pre-trip inspections on the generator set prior to the generator set leaving a pre-defined geographical area.
대표청구항▼
1. An automated method for diagnostic testing of a generator set used in association with a refrigerated container for transporting cargo, the generator set including a plurality of components and a generator set controller, the method comprising: the generator set controller determining whether the
1. An automated method for diagnostic testing of a generator set used in association with a refrigerated container for transporting cargo, the generator set including a plurality of components and a generator set controller, the method comprising: the generator set controller determining whether the generator set has entered a geo-fenced area;the generator set controller determining whether a pre-trip inspection is due to be performed on the generator set;the generator set controller performing a pre-trip inspection on the generator set when the generator set controller determines that the generator set is located within the geo-fenced area and a pre-trip inspection is due to be performed;determining whether the plurality of components is operating within acceptable limits; andgenerating a pre-trip inspection report based on the plurality of components. 2. The method of claim 1 wherein determining whether the generator set has entered the geo-fenced area comprises utilizing a generator set telematics unit associated with the generator set to receive and/or send signals via satellite to a remote server. 3. The method of claim 2 wherein determining whether the generator set has entered the geo-fenced area further comprises connecting the server to a user-accessible web site to permit an end user to view, in real time, the location of the generator set on the user-accessible web site. 4. The method of claim 3 wherein the geo-fenced area is a geographically mapped area viewable on the user-accessible web site. 5. The method of claim 1 wherein determining whether a pre-trip inspection is due comprises determining whether a pre-trip inspection has been performed on the generator set since the generator set has last entered the geo-fenced area including determining a last entry date of the generator set into the geo-fenced area. 6. The method of claim 5 further comprising displaying the last entry date on a user-accessible web site. 7. The method of claim 1 wherein automatically performing a pre-trip inspection comprises running a diagnostic test of at least one of an oil level switch, an oil pressure switch, a coolant temperature sensor, a coolant level, a speed solenoid relay, a preheat relay, a fuel hold relay, a fuel pull relay, and a fuel level corresponding to the generator set. 8. The method of claim 7 wherein the pre-trip inspection is performed entirely by the generator set controller associated with the generator set, without manual operation. 9. The method of claim 1 further comprising determining whether the pre-trip inspection is complete, determining whether the generator set is leaving the geo-fenced area, and informing a driver if the pre-trip inspection is not complete and the generator set is leaving the geo-fenced area, so as to inhibit the driver from leaving the geo-fenced area until the pre-trip inspection is complete. 10. A generator set system for use in association with a refrigerated container for transporting cargo, the generator set system comprising: a generator set comprising a prime mover and a generator;a generator set telematics unit associated with the generator set, the generator set telematics unit comprising GPS technology to identify a geographical location of the generator set,a generator set controller associated with the generator set, the generator set controller comprising a microprocessor, the generator set controller programmed to be in communication with both the generator set and the generator set telematics unit, the generator set controller programmed to: determine whether the generator set has entered a geo-fenced area;determine whether a pre-trip inspection is due to be performed on the generator set;perform a pre-trip inspection on the generator set when the generator set is located within the geo-fenced area and a pre-trip inspection is due to be performed. 11. The generator set system of claim 10 wherein the generator set controller is programmed to perform the pre-trip inspection prior to the generator set leaving the geo-fenced area, and wherein the pre-trip inspection can be performed entirely by the generator set controller, without manual operation. 12. The generator set system of claim 10 wherein the generator set controller is programmed to determine a last entry date of the generator set into the geo-fenced area, and to determine whether a pre-trip inspection has been performed on the generator set since the last entry date. 13. The generator set system of claim 10 wherein the pre-trip inspection comprises running a diagnostic test of at least one of an oil level switch, an oil pressure switch, a coolant temperature sensor, a coolant level, a speed solenoid relay, a preheat relay, a fuel hold relay, a fuel pull relay, and a fuel level corresponding to the generator set. 14. The generator set system of claim 10 further comprising a generator set controller antenna and a generator set telematics antenna. 15. The generator set system of claim 10 wherein the generator set microprocessor is programmed to store information relating to previous locations and pre-trip inspection reports for the generator set, and to direct transmission of the information relating to previous locations and pre-trip inspection reports to a remote server for display on a user-accessible web site. 16. A refrigerated cargo system comprising: a container for transporting cargo;a refrigeration system comprising: a refrigeration unit located on or within the container; anda refrigeration unit controller that includes a first microprocessor, the refrigeration unit controller programmed to be in communication with the refrigeration unit;a generator set system comprising: a generator set comprising a motor and generator; anda generator set controller that includes a second microprocessor, the generator set controller programmed to be in communication with both the generator set and the refrigeration unit controller, the generator set controller programmed to:determine whether the generator set has entered a geo-fenced area;determine whether a pre-trip inspection is due to be performed on the generator set;perform a pre-trip inspection on the generator set when the generator set is located within the geo-fenced area and a pre-trip inspection is due to be performed. 17. The refrigerated cargo system of claim 16 further comprising a generator set telematics unit comprising GPS technology to identify a geographical location of the generator set, the generator set controller programmed to be in communication with the generator set telematics unit. 18. The refrigerated cargo system of claim 16 further comprising a refrigeration unit controller antenna, a generator set controller antenna, and a generator set telematics antenna. 19. The refrigerated cargo system of claim 16 wherein the generator set controller is programmed to perform the pre-trip inspection prior to the generator set leaving the geo-fenced area. 20. The refrigerated cargo system of claim 16 wherein the pre-trip inspection comprises running a diagnostic test of at least one of an oil level switch, an oil pressure switch, a coolant temperature sensor, a coolant level, a speed solenoid relay, a preheat relay, a fuel hold relay, a fuel pull relay, and a fuel level corresponding to the generator set. 21. The refrigerated cargo system of claim 16, further comprising a remote server and a user-accessible web site, the remote server in communication with the generator set system so as to provide information regarding the generator set to the web site for user display. 22. The refrigerated cargo system of claim 16, wherein the generator set microprocessor is programmed to store information relating to previous locations and pre-trip inspection reports for the generator set, and to direct transmission of the information relating to previous locations and pre-trip inspection reports to a remote server for display on a user-accessible web site. 23. The refrigerated cargo system of claim 16, wherein the pre-trip inspection can be performed entirely by the generator set controller, without manual operation. 24. The refrigerated cargo system of claim 16, further comprising a power cord extending between the refrigeration system and the generator set system for directing electrical power from the generator set to the refrigeration unit. 25. The refrigerated cargo system of claim 16, wherein the generator set comprises a diesel motor, and the refrigeration unit comprises a condenser assembly and an evaporator assembly.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (15)
Porter Kevin J. ; Dobmeier Thomas J., Adaptive pretrip selection.
Lenz Douglas E. ; Brabec Ladislaus J. ; Hanson Jay L. ; Forsmark Dave ; Gaynor Mike P. ; Herrig Doyle G. ; Lee Phil L., Automatic pretrip for engine powered generator.
Jurewicz Romuald M. (St. Louis Park MN) Nixon James E. (Troy MI) Wong Albert C. K. (Golden Valley MN) Hanson Jay L. (Bloomington MN) Herrig Doyle G. (Elko MN), Method of converting a time based data logger to a time and random event based data logger.
Hanson Jay L. (Bloomington MN) Jurewicz Romuald M. (St. Louis Park MN), Methods and apparatus for monitoring the operation of a transport refrigeration system.
Cahill-O\Brien Barry P. (Syracuse NY) Nevin Michael W. (Syracuse NY) Sullivan Dennis W. (Elbridge NY), Pre-trip system for a controlled atmosphere system for a refrigerated container.
Porter Kevin J. ; Kopp Peter H. ; Malone Garret J. ; Rabbia Mark B. ; Dobmeier Thomas J., Pretrip routine comprising of individual refrigeration system components.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.