Monitoring control system and work support method
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
G05B-015/02
G05B-023/02
출원번호
US-0389932
(2016-12-23)
등록번호
US-10216179
(2019-02-26)
우선권정보
JP-2016-006086 (2016-01-15)
발명자
/ 주소
Machida, Yuta
Nakaya, Makoto
Amii, Hiromi
Takano, Naoto
Iketsuki, Yuya
출원인 / 주소
Yokogawa Electric Corporation
대리인 / 주소
Sughrue Mion, PLLC
인용정보
피인용 횟수 :
0인용 특허 :
12
초록▼
A monitoring control system includes: a safety control device that includes a state monitoring unit that monitors a state of a plant after emergency shut-down of the plant, and a work progress monitoring unit that monitors a work progress after the emergency shut-down of the plant; and a display dev
A monitoring control system includes: a safety control device that includes a state monitoring unit that monitors a state of a plant after emergency shut-down of the plant, and a work progress monitoring unit that monitors a work progress after the emergency shut-down of the plant; and a display device that displays, in a case where the emergency shut-down of the plant is performed by the safety control device, an emergency shut-down screen including a monitoring result of the state monitoring unit and a monitoring result of the work progress monitoring unit.
대표청구항▼
1. A monitoring control system comprising: a control device that includes an action execution unit that executes an action with respect to a plant after emergency shut-down of the plant, and controls devices provided in the plant based on process information obtained from the devices provided in the
1. A monitoring control system comprising: a control device that includes an action execution unit that executes an action with respect to a plant after emergency shut-down of the plant, and controls devices provided in the plant based on process information obtained from the devices provided in the plant;a safety control device that includes a safety control unit that performs the emergency shut-down of the plant in a case where an abnormality occurs in the plant, a state monitoring unit that monitors a state of the plant after the emergency shut-down of the plant, and a work progress monitoring unit that monitors a work progress after the emergency shut-down of the plant according to an execution situation of the action execution unit of the control device and that allows release of the emergency shut-down of the plant in a case where the work progress monitoring unit determines that work is completed; anda display device that displays, in a case where the emergency shut-down of the plant is performed by the safety control device, an emergency shut-down screen including a monitoring result of the state monitoring unit and a monitoring result of the work progress monitoring unit. 2. The monitoring control system according to claim 1, wherein the state monitoring unit determines a cause of the emergency shut-down of the plant, andthe display device displays the cause determined by the state monitoring unit on the emergency shut-down screen. 3. The monitoring control system according to claim 1, wherein the safety control device collects process information from devices provided in the plant, determines whether or not an abnormality occurs in the plant based on the collected information, and performs emergency shut-down of the plant by outputting a trigger signal for the emergency shut-down of the plant when determining that an abnormality occurs in the plant, andthe state monitoring unit starts its operation when receiving the trigger signal from the safety control station, and monitors a state of the plant after the emergency shut-down of the plant using information collected in the safety control device. 4. The monitoring control system according to claim 3, wherein the control device starts its operation when receiving the trigger signal from the safety control station, performs an operation of controlling the device provided in the plant to enter a stable state that is predetermined by changing operating conditions of the device, and outputs information regarding the operation to the work progress monitoring unit. 5. The monitoring control system according to claim 4, wherein the work progress monitoring unit starts its operation when receiving the trigger signal from the safety control station, determines whether or not the device is being in the stable state for a predetermined time based on the information regarding the operation from the control device, and outputs an allowance signal indicating allowance of interlock resetting of the plant to the display device when determining that the device is being in the stable state for the predetermined time, andthe display device displays a release button for releasing the emergency shut-down of the plant on the emergency shut-down screen when receiving the allowance signal. 6. The monitoring control system according to claim 1, wherein the state monitoring unit monitors a preset important monitoring device to determine whether the device is normal or abnormal, and notifies a place where the abnormality occurs to the display device when determining that the device is abnormal, and the display device changes a display of at least one of the monitoring result of the state monitoring unit and the monitoring result of the work progress monitoring unit in the emergency shut-down screen when an abnormality occurrence place is notified to the display device from the state monitoring unit. 7. The monitoring control system according to claim 1, wherein the state monitoring unit detects an initially obtained cause among plural causes which are considered as causes of the emergency shut-down of the plant as a main cause of the emergency shut-down of the plant, and notifies the main cause to the display device, andthe display device displays the main cause determined by the state monitoring unit on the emergency shut-down screen. 8. The monitoring control system according to claim 1, wherein the display device displays a process flow diagram in which devices necessary for performing work after the emergency shut-down of the plant are collectively shown, among devices provided in the plant, on the emergency shut-down screen. 9. The monitoring control system according to claim 8, wherein the display device displays time series information obtained from devices included in the process flow diagram, among devices for which monitoring is necessary after the emergency shut-down of the plant in an overlapping manner on the process flow diagram. 10. The monitoring control system according to claim 1, wherein the display device displays time series information obtained from devices for which monitoring is necessary after the emergency shut-down of the plant on the emergency shut-down screen. 11. The monitoring control system according to claim 1, wherein in a case where the work progress monitoring unit allows the release of the emergency shut-down of the plant, the display device displays a release button that releases the emergency shut-down of the plant on the emergency shut-down screen. 12. The monitoring control system according to claim 1, wherein, in a case where an abnormality of a device provided in the plant occurs after the emergency shut-down of the plant, the state monitoring unit notifies the display device of a place where the abnormality occurs, andthe display device changes the display of at least one of the monitoring result of the state monitoring unit and the monitoring result of the work progress monitoring unit on the emergency shut-down screen according to notification details from the state monitoring unit. 13. The monitoring control system according to claim 1, wherein the display device displays a link button to the emergency shut-down screen on a plant operation screen in a case where the emergency shut-down of the plant is performed by the safety control device, and displays the emergency shut-down screen when a manipulation with respect to the link button is performed. 14. The monitoring control system according to claim 1, wherein the emergency shut-down of the plant comprises reliably stopping the plant in a safe state in order to prevent an explosion accident, an injury accident, or environmental contamination before the explosion accident, the injury accident or the environmental contamination, respectively, occurs. 15. A work support method for supporting work performed after emergency shut-down of a plant, the work support method comprising: monitoring, by a safety control device, a state of the plant after the emergency shut-down of the plant;monitoring, by the safety control device, a work progress after the emergency shut-down of the plant according to an execution situation of an action execution unit of a control device, the control device controlling devices provided in the plant based on process information obtained from the devices provided in the plant, the action execution unit executing an action with respect to the plant after the emergency shut-down of the plant;displaying, on a display device, an emergency shut-down screen including a monitoring result of monitoring the state of the plant and monitoring the work progress; andallowing, by the safety control device, release of the emergency shut-down of the plant in a case where the safety control device determines that work is completed. 16. The work support method according to claim 15, wherein monitoring the state of the plant comprises determining a cause of the emergency shut-down of the plant; andthe displaying comprises displaying the cause on the emergency shut-down screen. 17. The work support method according to claim 15, wherein the displaying comprises: displaying a process flow diagram in which devices necessary for performing work after the emergency shut-down of the plant are collectively shown, among devices provided in the plant, on the emergency shut-down screen. 18. The work support method according to claim 17, wherein the displaying comprises: displaying time series information obtained from devices included in the process flow diagram, among devices for which monitoring is necessary after the emergency shut-down of the plant in an overlapping manner on the process flow diagram. 19. The work support method according to claim 15, wherein the displaying comprises: displaying time series information obtained from devices for which monitoring is necessary after the emergency shut-down of the plant on the emergency shut-down screen. 20. The work support method according to claim 15, further comprising: in a case where the safety control device determines that work is completed, displaying a release button for releasing the emergency shut-down of the plant on the emergency shut-down screen.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (12)
Reed, Wiley Zane; Cosper, Bobby R.; Schmidt, Kenneth G.; Bultz, Neil D.; Wickersham, Charles E.; Matera, John P., Automated sputtering target production.
Scarola Kenneth (Windsor CT) Jamison David S. (Windsor CT) Manazir Richard M. (North Canton CT) Rescorl Robert L. (Vernon CT) Harmon Daryl L. (Enfield CT), Display device for indicating the value of a parameter in a process plant.
Catanese ; Jr. Anthony T. (724 First St. Mamaroneck NY 10543) DiMaggio Anthony (Lake Carmel NY), Method and apparatus for fail-safe control of at least one electro-mechanical or electro-hydraulic component.
Makel Darby B. (Sacramento CA) Jansa Earl D. (Shingle Springs CA) Cahill Daniel V. (Fair Oaks CA) Bickmore Timothy W. (Sacramento CA), Remotely controllable LNG field station management system and method.
Wachholz Winfried (Gorxheimertal DEX) Weicht Ulrich (Weinheim DEX) Schulten Rudolf (Richterich DEX), Safety system for a gas cooled high temperature reactor.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.