This is a study of clarifying the legal principle of partitioned supremacy for transmission tower installation, and the legal principle on the indemnification for the deficits occurring in sites under transmission towers and high voltage lines after installation of transmission tower. To solve this ...
This is a study of clarifying the legal principle of partitioned supremacy for transmission tower installation, and the legal principle on the indemnification for the deficits occurring in sites under transmission towers and high voltage lines after installation of transmission tower. To solve this problems, this paper examined the characteristics of partitioned supremacy, the need for cubic usage of land and space and the usage conditions. And then, I studied the deficits and compensation of sites under transmission towers and transmission lines based on Civil Law Article 289 Paragraph 2. To install transmission tower, space above the land or each floor of basement can be used by obtaining existing supremacy, easement, lease right or deposit based lease right. However, because this method involves several problems, ultimately, the method of using supremacy was determined as the most reasonable so this paper examined the legal principle of supremacy. The purpose of this thesis is to found the legal basis on the current supremacy establishment and compensation that are occurring due to transmission tower and line installations and analyzed the problems based on precedents and cases. So, I proposed concrete arguments to establish partitioned supremacy for transmission tower installation and sites under transmission lines. The contents of this study are as follows. In chapter 2, this study looked into the general theories of supremacy for transmission tower installation. In chapter 3, this study explained sites under transmission towers and lines, the concept and classification of sites under transmission lines, and clarified the legal basis on transmission tower installation and compensation for sites under transmission lines. In chapter 4, this study analyzed deficits cases about transmission towers and sites under transmission lines through various documents, data and precedents, and reviewed the problems. At last, In chapter 5, I proposed solutions for various losses occurring in transmission towers and sites under transmission lines.
This is a study of clarifying the legal principle of partitioned supremacy for transmission tower installation, and the legal principle on the indemnification for the deficits occurring in sites under transmission towers and high voltage lines after installation of transmission tower. To solve this problems, this paper examined the characteristics of partitioned supremacy, the need for cubic usage of land and space and the usage conditions. And then, I studied the deficits and compensation of sites under transmission towers and transmission lines based on Civil Law Article 289 Paragraph 2. To install transmission tower, space above the land or each floor of basement can be used by obtaining existing supremacy, easement, lease right or deposit based lease right. However, because this method involves several problems, ultimately, the method of using supremacy was determined as the most reasonable so this paper examined the legal principle of supremacy. The purpose of this thesis is to found the legal basis on the current supremacy establishment and compensation that are occurring due to transmission tower and line installations and analyzed the problems based on precedents and cases. So, I proposed concrete arguments to establish partitioned supremacy for transmission tower installation and sites under transmission lines. The contents of this study are as follows. In chapter 2, this study looked into the general theories of supremacy for transmission tower installation. In chapter 3, this study explained sites under transmission towers and lines, the concept and classification of sites under transmission lines, and clarified the legal basis on transmission tower installation and compensation for sites under transmission lines. In chapter 4, this study analyzed deficits cases about transmission towers and sites under transmission lines through various documents, data and precedents, and reviewed the problems. At last, In chapter 5, I proposed solutions for various losses occurring in transmission towers and sites under transmission lines.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.