최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기大韓造船學會 論文集 = Journal of the society of naval architects of korea, v.53 no.1, 2016년, pp.29 - 36
함동균 (한국해양대학교 조선해양시스템공학과) , 백명기 (서울대학교 조선해양공학과) , 박중구 (삼성중공업) , 우종훈 (한국해양대학교 조선해양시스템공학과)
In shipbuilding and offshore plant construction, pipe-stools of various types are installed. Moreover, these are many quantities but they must be installed in a successive manner. Due to these characteristics the pipe-stool installation processes easily tends to cause the schedule delays in the over...
Ha, D.G., 2013. Soft sensor design on fractionation process for LNG plant using PLS and variable selection. Master's Thesis. Seoul National University.
Im, J.S., 2012. Improvement for individual work order process in manufacturing piping spool of offshore facilities. Master's Thesis. University of Ulsan.
Jang, Y.J., 2012. Utilizing Big-data’s Technology in Manufacturing Field. Journal of The Korean Institute of Communication Sciences, 29(11), pp.30-36.
Jung, G.S., 2012. Presumed Influence Factors of Decision-Making of Mega-Projects. Audit and Inspection Research Institue, 19(1), pp.91-124.
Kim, D.J., 2012. Models of local finance decisions using PLS regression analysis : cities and counties in Gyeongnam. Master's Thesis. Gyeongsang National University.
Kim, H.J., 2010. A study on forecasting model of in semiconductor device fabrication. Master's Thesis. Korea University.
Kim, S.S., 2015. The Three Heavy Industries Operating Loss Sharply. Monthly Marintime Korea, 2015(6), pp.84-87.
Lee, H.S., 2013. A case study on improvement of pipe outfitting production process using TOC. Master's Thesis. University of Ulsan.
Lee, H.S. & Im, J.H., 2015. SPSS 22 Manual. 1st Ed. Jyphyuntae: Seoul.
National Information Society Agency(NIA), 2015. 2015 global big data Casebook. National Information Society Agency: Korea.
Okumoto Yasuhisa, 2012. Shipbuilding Technology & Production System. Translated by Kim, Y.S. GS-intervision: Seoul.
Seong, H.G., 2014. A Proposal for Rowth of Offshore Plant Industries. Machinery Industry, 2014(9), pp.41-48.
Yan, W., 2012. Automatic Generation of Assembly Sequence for the Planning of Outfitting Processes in Shipbuilding. Journal of Ship Production and Design, 28(2), pp.49-59.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.