최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of KIBIM = 한국BIM학회논문집, v.11 no.3, 2021년, pp.1 - 11
허승하 (한양대학교 건축공학과) , 심재형 (한양대학교 건축공학과) , 함남혁 (한양사이버대학교 건축도시건설공학부) , 김재준 (한양대학교 건축공학부)
BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performanc...
A GUIDE TO THE PROJECT MANAGEMENt BODY OF KNOWLEDGE, (PMBOK Guide) - Fifth Edition.
Cho, S. H., Yoon, B. K. (2019). An Analysis on the Operation Level of the Dry Dock for Warship Maintenance Using Priority Queue, The Korean Operations Research and Management Science Society, 36(1), pp. 37-49.
Frederick s., Gerald J.(2013). Management Science, Introduction to Operations Management. 9th Edition. McGrawHill. Chapter 17.
Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
Ham, N. H., Moon, S. K., Kim, J. H., Kim, J. J. (2020). Optimal BIM staffing in construction projects using a queueing model, Automation in Construction, 113, pp. 1-14.
Ham, N. H., Yuh, O. K., Ji, K. H. (2018). Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase, Journal of Korea Institute of Building Information Modeling, 8(3), pp. 31-42.
Ham, N. K., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of Korea Institute of Building Information Modeling, 5(2), pp. 1-11.
Her, B., Shim, J. H., Kim, H. S., Kim, D. H. (2012). Design Error Classification and Causation in BIM Design, Journal of the Architectural Institute of Korea, 28(10), pp. 21-29.
Ji, K. C., Yu, J. H., Kim, C. D. (2006). The Schema of Work Delay Analysis by Input Factor in Construction, Architectural Institute of Korea, 22(11), pp. 181-188.
Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, ournal of Korea Institute of Building Information Modeling, 6(2), pp. 47-57.
Kim, H. J., Yoo, M. Y., Kim, J. J., Choi, C. S. (2017). Performance Analysis of BIM Labor using Case Analysis, Journal of Korea Institute of Building Information Modeling, 7(3), pp. 31-39.
Kim, I. H., Cho, G. H., Choi, J. S., Chun, E. Y. (2011). Open BIM-based Vertical Circulation Planning and Verifying Modules for Super-Tall Building at the Schematic Design Phase, Korean Journal of Computational Design and Engine, 16(2), pp. 156-164.
Kim, J. H. (2008). The Constitution Plan of Design Error Management System in Construction Projects, Architectural Institute of Korea, 10(3), pp. 231-238.
Ku, S. H., Ahn, B.J., Kim, J. H. (2003). Improving Construability by Analyzing Influencing Factors of Core-Wall Construction, Korea Journal of Construction Engineering and Management, 2003, pp. 606-609.
Lee, G., Park, H. K., Won, J. S. (2012). D3 City project-Economic impact of BIM-assisted design validation, Automation in Construction, 22, pp. 577-586.
Lee, N. J., Kim, J. H., Ji, S. M., Hyun, C. T. (2011). Development of Construction Documents Checklist for Preventing Error of Design Process in Public Construction Projects, JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA, 27(2), pp. 149-158.
Lobert, L., Peter, E. D. L., David, J. E., Peter, R. D. (2010). Design Error Classification, Causation, and Prevention in Construction Engineering, Journal of Performance of Constructed Facilities, 24(4), pp. 399-408.
Neelamkavil, J., Ahamed, S. S. (2012). The Return on Investment from BIM-driven Projects in Construction, IRC-RR-324 National Research Council, Canada, 324, pp. 1-26.
Bailey, Norman T. J. (2003) A STUDY OF QUEUES AND ApPOINTMENT SYSTEMS IN HOSPITAL OUT-PATIENT DEPARTMENTS, WITH SPECIAL REFERENCE TO WAITING-TIMES, 185, pp. 185-198.
Park, H. D. (2020). An Analysis of Structural Framework Performance of LMT tower in Haeundae- 101 story Reinforced Concrete High-rise Building-, ARCHITECTURAL INSTITUTE OF KOREA, 40(1), pp. 352-355.
Shin, H. W., Kim, G. H., Kim, J. Y., Cho, H. K. (2007). A Research on a Comparison between the Strength and Weakness of Each Form work Methods in the Core Wall Construction, Journal of the Korea Institute of Building Construction, pp. 153-159.
TUGBA, C. Y., EMRE, V. (2003). OUTPATIENT SCHEDULING IN HEALTH CARE: A REVIEW OF LITERATURE, PRODUCTION AND OPERATIONS MANAGEMENT, 12(4), pp. 519-549.
Won, J. S. (2017). An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression, Journal of the Korea Institute of Building Construction, 17(1), pp. 264-267.
Yang, D. S. (2017). Development of an Verification System for Enhancing BIM Design Base on Usability, Land and Housing Institute, 8(1), pp. 23-29.
Yun, T. H., Han, M. C., Ham, N. H., Kim, J. J. (2019). A Case Study on the Benefits of Construction Project with BIM, Journal of Korea Institute of Building Information Modeling, 9(4), pp. 10-20.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
출판사/학술단체 등이 한시적으로 특별한 프로모션 또는 일정기간 경과 후 접근을 허용하여, 출판사/학술단체 등의 사이트에서 이용 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.