최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of KIBIM = 한국BIM학회논문집, v.11 no.2, 2021년, pp.1 - 16
정련의 (한양대학교 건축공학과) , 김웅기 (한양대학교 건축환경공학과) , 함남혁 (한양사이버대학교 건축도시건설공학부) , 김재준 (한양대학교 건축공학부)
Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improv...
Brotherton, S. A., Fried, R. T., Norman, E. S. (2008). Applying the work breakdown structure to the project management lifecycle. Paper presented at the PMI Global Congress Proceedings.
Choi, H. J., Yun, S. H. (2019). Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models, Korea Journal of Construction Engineering and Management, 20(6), pp. 89-97.
Devi, T. R., Reddy, V. S., J. I. J,. E. R. A. (2012). Work breakdown structure of the project. 2(2), pp. 683-686.
Designing Buildings Ltd., (2020). Bill of quantities BOQ, Designing Buildings Wiki, Share your construction industry knowledge, https://www.designingbuildings.co.uk/wiki/Bill_of_quantiti es_BOQ
Ezcan, V., Isikdag, U., Goulding, J. (2013). BIM and offsite manufacturing: recent research and opportunities. Paper presented at the 19th CIB World Building Congress Brisbane, Australia.
Fan, S. L., Wu, C. H., Hun, C. C. J. J. O. A. S., Engineering. (2015). Integration of cost and schedule using BIM. 18(3), pp. 223-232.
Grytting, I., Svalestuen, F., Lohne, J., Sommerseth, H., Augdal, S., Ladre, O. J. P. E. (2017). Use of LoD decision plan in BIM-projects. 196, pp. 407-414.
Gledson, B. J., Greenwood, D. J. E., Construction, Management, A. (2017). The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach.
Han, K. K., Golparvar-Fard, M. J. A. I. C. (2015). Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs. 53, pp. 44-57.
Halpin, D. W. (2006) Construction Management. 3rd ed. NJ: John Wiley Sons.
Howard, R., Bj rk, B. C. (2008). Building information modeling - experts' view on standardization and indust ry deve lopment. Advanced Engineering Informatics, 22(2), pp. 271-280.
Jin, Z., Gambatese, J., Liu, D., Dharmapalan, V. J. E., Construction, Management, A. (2019). Using 4D BIM to assess construction risks during the design phase.
Koh, S. H., Ham, N. H., Lee, J. S., Yoon, S. W., Kim, J. J. J. J. O. K. (2017). Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects-Focused on BIM Journals and Award Winning Projects. 7(2), pp. 25-35.
Lee, S. K., Kim, K. R., Yu, J. H. J. A. i. c. (2014). BIM and ontology-based approach for building cost estimation. 41, pp. 96-105.
Lee, X. S., Tsong, C. W., Khamidi, M. F. (2016). 5D Building information modelling-a practicability review. Paper presented at the MATEC Web of Conferences.
Liu, H., Lu, M., Al-Hussein, M. (2014). BIM-based integrated framework for detailed cost estimation and schedule planning of construction projects. Paper presented at the ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction.
Lu, M., Hasan, T., Hasan, M. COMPARATIVE STUDY OF UNIFORMAT AND MASTERFORMAT FOR CONSTRUCTION COST ESTIMATING.
Lu, W., Lai, C. C., Tse, T. (2018). BIM and Big Data for Construction Cost Management: Routledge.
Lu, Q., Won, J., Cheng, J. C. J. I. J. o. P. M. (2016). A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM). 34(1), pp. 3-21.
Marzouk, M., Enaba, M. (2019). Analyzing project data in BIM with descriptive analytics to improve project performance. Built Environment Project and Asset Management.
Moon, H. J., Choi, M. S., Kim, S. K., Ryu, S. H. (2011). Case studies for the evaluation of interoperability between a BIM based architectural model and building performance analysis programs. Paper presented at the Proceedings of 12th conference of international building performance simulation association.
Mayouf, M., Gerges, M., Cox, S. J. J. o. E., Design, Technology. (2019). 5D BIM: an investigation into the integration of quantity surveyors within the BIM process.
Meredith, J. R., Mantel, S. (2012). Project Management, Hoboken. In: NJ, USA: Wiley.
Malacarne, G., Toller, G., MARCHER, C., Riedl, M., Matt, D. T. J. I. J. o. S. D., Planning. (2018). Investigating benefits and criticisms of BIM for construction scheduling in SMEs: an Italian case study. 13(1), pp. 139-150.
Nadeem, A., Wong, A. K., Wong, F. K. J. A. J. f. S., Engineering. (2015). Bill of quantities with 3D views using building information modeling. 40(9), pp. 2465-2477.
Oh, K.S., Park, S. H., Song, J. W. (2016). A Study on the Using of BIM Data and Template for Construction Progress Management, Journal of the Korea Academia-Industrial cooperation Society, 17(8), pp. 157-163.
Plebankiewicz, E., Zima, K., Skibniewski, M. J. P. E. (2015). Analysis of the first Polish BIM-Based cost estimation application. 123, pp. 405-414.
Sattineni, A., Bradford, R. H. J. P. o. t. t. I., Seoul, Korea. (2011). Estimating with BIM: A survey of US construction companies. pp. 564, 569.
Sattineni, A., Macdonald, J. A. (2014). 5D-BIM: A case study of an implementation strategy in the construction industy. Paper presented at the ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction.
Siami-Irdemoosa, E., Dindarloo, S. R., Sharifzadeh, M. J. A. i. C. (2015). Work breakdown structure (WBS) development for underground construction. 58, pp. 85-94.
Supriadi, L., Wisesatama, B., Latief, Y. (2018). Development of work breakdown structure (WBS) dictionary for road construction works. Paper presented at the IOP Conference Series: Earth and Environmental Science.
Sulankivi, K., Makela, T., Kiviniemi, M. (2009). BIM-based site layout and safety planning. Paper presented at the Proceedings of the First International Conference on Improving Construction and Use through Integrated Design Solutions.
Stanley, R., Thurnell, D. (2014). The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand.
Staub-French, S., Fischer, M., Kunz, J., and Paulson, B. (2003). An ontology for relating features with activities to calculate costs. Journal of Computing in Civil Engineering, 17(4), pp. 243-254.
Wu, S., Wood, G., Ginige, K., Jong, S. W. J. J. o. I. T. i. C. (2014). A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools. 19, pp. 534-562.
Zima, K. J. P. e. (2017). Impact of information included in the BIM on preparation of Bill of Quantities. 208, pp. 203-210.
Zecheru, V., Olaru, B. G. J. R. o. I. C. M. R. d. M. C. I. (2016). Work Breakdown Structure (WBS) in Project Management. 17(1).
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
출판사/학술단체 등이 한시적으로 특별한 프로모션 또는 일정기간 경과 후 접근을 허용하여, 출판사/학술단체 등의 사이트에서 이용 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.