최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.23 no.2, 2022년, pp.76 - 84
김화랑 (한국건설산업연구원 산업정책연구실) , 이광표 (한국건설산업연구원 산업정책연구실) , 전영준 (한국건설산업연구원 산업정책연구실) , 장현승 (서울과학기술대학교 건축학부)
Recently, as the frequency of natural disasters has increased, causing enormous human and material damage, the importance of managing disasters is emphasized. In particular, as the concept of Build Back Better becomes meaningful, it has appeared that considering it during Post-disaster Reconstructio...
Al-Quershi, M.T., and Kishore, R. (2017). "Claim causes and types in indian construction Industry-Contractor's perspective," American Journal of Civil Engineering and Architecture, 5(5), pp. 196-203.
Amaratunga, D., and Haigh, R.P. (2011). "Introduction", in Amaratunga, D. and Haigh, R.P. (Eds).
Carter, W.N. (2008). Asian Development Bank, Metro Manila., pp. 101-185.
Chan, D.W., and Kumaraswamy, M.M. (1997). "A comparative study of causes of time overruns in Hong Kong construction projects," International Journal of project management, 15(1), pp. 55-63.
Chang, Y., Wilkinson, S., Potangaroa, R., and Seville, E. (2011). "Identifying factors affecting resource avaiability for post-disaster reconstruction: a case study in China," Constrcution Management and Economics, 29(1), pp. 37-48.
Collaborative, E.P. (2004). "Participatory planning guide for post-disaster reconstruction." EPC-Environmental Planning Collaborative, TCG International, LLC, pp. 1-22.
Da Silva, J. (2010). Key considerations in post-disaster reconstruction, Practical Action Publishing, UK.
Enshassi, A., and Zaiter, M.A. (2013). "Self-help approach in housing reconstruction and beneficiaries satisfaction in Palestine," In Proceedings of the international symposium on new technologies for urban safety of mega cities in Asia, pp. 9-11.
Enshassi, A., Chatat, T., Von Meding, J., and Forino, G. (2017). "Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories," International Journal of Disaster Risk Science, 8(4), pp. 402-414.
Felix, D., Branco, J.M., and Feio, A. (2013). "Temporary housing after disasters: A state of the art survey," Habitat International, 40, pp. 136-141.
GFDRR (Global Facility for Disaster Reduction and Recovery). (2017). Post-Disaster Needs Assessments Guidelines Volume B: Community Infrastructure.
Hallegatte, S., Rentschler, J., and Walsh, B. (2018). Building Back Better. World Bank, Washington, DC.
Hayles, C.S. (2010). "An examination of decision making in post disaster housing reconstruction," International Journal of Disaster Resilience in the Built Environment. 1(1), pp. 103-122
Ismail, D., Majid, T.A., Roosli, R., and Ab Samah, H.N. (2014). "A review of project management for post-disaster reconstruction project: from international NGOs (INGOs) perspective." Research in Civil and Environmental Engineering, 2(4), pp. 199-215.
Ismail, D., Majid, T., and Roosli, R. (2017). "Analysis of Variance of the Effects of a Project's Location on Key Issues and Challenges in Post-Disaster Reconstruction Projects." Economies, 5(4), : 46.
Jha, A.K. (2010). Safer homes, stronger communities: a handbook for reconstructing after natural disasters. The World Bank. Washington DC
Kim, H.R., (2019). "Toward a Framework for Project Management of Post-Disaster Reconstruction Projects." P.h. thesis, Seoul National University of Science and Technology.
Labadie, J.R. (2008). "Auditing of post-disaster recovery and reconstruction activities," Disaster Prevention and Management, 17(5), pp. 575-586.
Le, K.N., and Tam, V.W.Y. (2007). "A survey on effective assessment methods to enhance student learning." Australasian Journal of Engineering Education, 13(2), pp. 13-20.
Mizutori, M., and Guha-Sapir, D. (2020). Human Cost of Disasters: An Overview of the Last 20 years (2000-2019). Centre for Research on the Epidemiology of Disasters (CRED) and United Nations Office for Disaster Risk Reduction (UNDRR), Belgium and Switzerland.
Muhammad, C., and Kashif, M. (2012). Analysis of Causes of Success and Failure of Post Disaster Reconstruction Projects.
Nunnally, J.C. (1978). Psychometric Theory 2nd Edition, McGraw-Hill, New York.
Operations, E., and Team, E.R. (2011). How-to guide: Managing post-disaster (re)-construction projects. Baltimore, MD: Catholic Relief Services.
Ophiyandri, T., Amaratunga, D., Pathirage, C., and Keraminiyage, K. (2013). "Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia," International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 236-249.
Post-disaster Reconstruction of the Built Environment: Rebuilding for Resilience, Wiley, Chichester, pp. 1-12.
Rawal, V., and Prajapati, D. (2007). Assessing Damage After Disasters: A Participatory Framework and Toolkit. Unnati--Organisation for Development Education.
Simonovic, S.P., and Peck, A. (2013). "Dynamic resilience to climate change caused natural disasters in coastal megacities quantification framework." International Journal of Environment and Climate Change, pp. 378-401.
Schneider, C. (2012). Sustainable Reconstruction in Urban Areas: A Handbook International Federation of Red Cross And Red Crescent Societies, Geneva.
Sun, C., and Xu, J. (2011). "Estimation of time for Wenchuan Earthquake reconstruction in China," Journal of Construction Engineering and Management, 137(3), pp. 179-187.
Von Meding, J., Wong, J., Kanjanabootra, S., and Tafti, M.T. (2016). Competence-based system development for post-disaster project management. Disaster prevention and management, 25(3), pp. 375-394.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.