최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.23 no.2, 2022년, pp.3 - 15
이재일 (충북대학교 토목공학과) , 정은지 (충북대학교 토목공학부) , 김시남 (대우에스티 생산관리팀) , 정근채 (충북대학교 토목공학부)
In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defi...
Jeong, J.Y., Kwon, W., Park, S.J., and Chun, J.Y. (2006). "A Study on Application of Lean Construction Theory in Schedule Management." Proceedings of the KICEM 2006 Conference, KICEM, pp. 515-518.
Kelton, W.D., Sadowski, R.P., and Zupick, N.B. (2015). "Simulation with Arena 6th edition." McGraw-Hill Education, USA
Kim, J.S. (2001). "Simulation of Optimized Production Technology System to Verify the Supply Chain Management's Effectiveness." Journal of the Korean Society of Computer and Information, KSCI, 6(1), pp. 95-102.
Kim, S., Kim, K.M., Park, C.H., and Kim, K.J. (2005). "Evaluation on WBS for Integrated Management of Steel Box Girder Production Process." Journal of the Korean Society of Civil Engineers, KSCE, 25(6D), pp. 867-875.
Kim, T.Y., Park, M.S., Lee, H.S., Seo, S.W., Lee, J.H., and Kim, S.Y. (2013). "Optimization Methodology of Modular Unit Factory Production Process Using DSM." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 29(6), pp. 113-122.
Kyung, K.S., Kwon, S.C., Bae, J., and Choi, H.H. (2017). "Survey and Analysis for Strengthening Competitiveness of Steel Bridge." Magazine and Journal of Korean Society of Steel Construction, KSSC, 29(6), pp. 20-30.
Lee, S.Y. (2013). "Eco-friendly Construction and Activation of Steel Structure." KSCE Journal of Civil and Environmental Engineering Research, KSCE, 61(2), pp. 19-21.
Lee, T.S., Park, E.S., and Lee, D.W. (2011). "Development of Supply Chain Management Education Programs for the Construction Industry." Journal of The Korean Society of Civil Engineers D, KSCE, 31(2), pp. 275-284.
Little, J.D.C. (1961). "A Proof for the Queuing Formula:Lλ W." Operations Research, INFORMS, 9(3), pp. 383-387.
Moon, D.H., Nam, Y.S., and Shin, Y.W. (2016). "Effects of Additional Sub-lines and Buffer Allocation on the System Performance in an Automotive Body Shop." Journal of the Korean Society of Supply Chain Management, KSCM, 16(2), pp. 135-145.
Park, S.H., Kim, Y.S., and Chin, S.Y. (2003). "Implementation of Supply Chain Management in Construction Industry." Korean Journal of Construction Engineering and Management, KICEM, 4(3), pp. 85-94.
Rockwell Automation (2020). "Arena Simulation Software (16.00.00)." USA, (Sept. 1, 2021)
Sargent, R.G. (2010). "Verification and Validation of Simulation Models." Proceedings of the 2010 Winter Simulation Conference, IEEE, pp. 166-183.
Seong, T.R., and Park, C.H. (2019). "Review on the Steel Bridge Market and Suggestions on Its Increase" KSCE 2019 Convention, KSCE, pp. 1163-1164.
Son, J.W. (2020). "A Study on Supply Chain Management in Off-Site Construction Projects." Proceedings of the Architectural Institute of Korea Conference, AIK, 40(2), pp. 558.
Yoon, S.B., Park, M.S., and Lee, H.S. (2020). "Discrete-Event Simulation for Modular Construction Manufacturing Planning." Proceedings of the Architectural Institute of Korea Conference, AIK, 40(1), pp. 419-420.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.