NTIS 바로가기한국건축시공학회지 = Journal of the Korea Institute of Building Construction, v.22 no.2, 2022년, pp.195 - 205
원종성 (Department of Architecture, Korea National University of Transportation) , 함성일 (Department of Architecture, Engineering, Jeonju University) , 장세준 (Department of Architectural Engineering, Kyungil University)
This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the c...
Won JS, Cheng JCP, Lee G. Quantification of construction and demolition waste prevented by BIM-based design validation: case studies in south korea. Waste Management. 2016 Mar;49:170-80. https://doi.org/10.1016/j.wasman.2015.12.026
Lee G, Park KH, Won JS. D 3 city project - economic impact of BIM-assisted design validation. Automation in Construction. 2012 Mar;22:577-86. https://doi.org/10.1016/j.autcon.2011.12.003
Korman TM, Tatum CB. Prototype tool for mechanical, electrical, and plumbing coordination. Journal of Computing in Civil Engineering. 2006 Jan:20(1):38-48. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:1(38)
Tatum CB, Korman TM. MEP Coordination in Building and Industrial Projects. Stanford (CA): Stanford University; 1999. 51 p. Report No.: TR54.
Mahanim H, Lauri K, Mohan S. Traditional cost management vs. lean cost management. Proceedings of the 18th CIB World Congress; 2010 May 10-13; Salford, United Kingdom. Kanata (Canada): CIB Publication; 2010. p. 280-93.
Khanzode A, Fischer M, Reed D. Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project. Electronic Journal of Information Technology in Construction. 2008 Jun;13:324-42.
Pishdad-Bozorgi P, Moghaddam, EH, Karasulu Y. Advancing target price and target value design process in IPD using BIM and risk-sharing approaches. Proceedings of 49th Annual International Associated School of Construction; 2013 Apr 10-13; San Luis Obispo, CA. Cheyenne (WY): the Associated Schools of Construction; 2013. p. 1-9.
Tatum CB, Korman TM. Coordinating building systems: process and knowledge. Journal of Architectural Engineering. 2000 Dec:6(4):116-21. https://doi.org/10.1061/(ASCE)1076-0431(2000)6:4(116)
Korman TM, Fischer M, Tatum CB. Knowledge and reasoning for MEP coordination. Journal of Construction Engineering and Management. 2003 Dec:129(6):627-34. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(627)
Khanzode A. An Integrated, Virtual Design and Construction and Lean (IVL) Method for Coordination of MEP. Stanford (CA): Stanford University; 2010. 35 p. Report No.: TR187
Sacks R, Radosavljevic M, Barak R. Requirements for building information modeling based lean production management systems for construction. Automation in Construction. 2010 Aug:19(5):641-55. https://doi.org/10.1016/j.autcon.2010.02.010
Gao J, Fischer M. Framework and case studies comparing implementations and impacts of 3D/4D modeling across projects. Stanford (CA): Stanford University; 2008. 113p. Report No.:TR172.