최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기터널과 지하공간: 한국암반공학회지 = Tunnel and underground space, v.33 no.4, 2023년, pp.244 - 254
기경민 (부경대학교 에너지자원공학과) , 김정주 (한국전력공사 전력연구원 송변전연구소) , 정호영 (부경대학교 에너지자원공학과)
The disc cutter mounted on the Tunnel Boring Machine (TBM) is subjected to cutting forces in three dimensions during rock excavation process. It is widely known that the cutting forces increased with the strength of the rock mass, while the rolling force can be significantly increased when the disc ...
Chang, S.H., Choi, S.W., Park, Y.T., Lee, G.P., and Bae, G.J., 2012, Characterization of the deformation of a disc cutter in linear rock cutting test, Journal of Korean Tunnelling and Underground Space Association, 14(3), 197-213.
Chang, S.H., Choi, S.W., Park, Y.T., Lee, G.P., and Bae, G.J., 2013, Experimental evaluation of the effects of cutting ring shape on?cutter acting forces in a hard rock, Journal of Korean Tunnelling and Underground Space Association, 15(3), 225-235.
Choi, S.W., Chang, S.H., Park, Y.T., Lee, G.P., and Bae, G.J., 2013, A experimental study on the loads and temperature acting on?the shaft of a disc cutter during linear rock cutting test, Journal of Korean Tunnelling and Underground Space Association,?15(3), 237-251.
Edelmann, T. and Himmelsbach, C., 2013, Device for monitoring the state of rotation of a disk cutter arrangement of a shield tunnel?boring machine and disk cutter arrangement for a shield tunnel boring machine, Patent number WO 2013/050010A2.
Entacher, M., Winter, G., Bumberger, T., Decker, K., Godor, I., and Galler, R., 2012, Cutter force measurement on tunnel boring?machines - System design, Tunnelling and Unerground Space Technology, 31(5), 97-106.
Entacher, M., Winter, G., and Galler, R., 2013, Cutter force measurement on tunnel boring machines - Implementation at Koralm?tunnel, Tunnelling and Unerground Space Technology, 38(3), 487-496.
Huang, X., Liu, Q., Liu, B., Wang, D., Wang, X., and Zeng, C., 2022, Development and in-situ application of a real-time cutting?tool forces monitoring system in TBM tunneling, Tunnelling and Unerground Space Technology, 124, 104453.
Lan, H., Xia, Y., Zhu, Z., Ji, Z., and Mao, J., 2016, Development of on-line rotational speed monitor system of TBM disc cutter,?Tunnelling and Unerground Space Technology, 57, 66-75.
Rostami, J., 1997, Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling?and physical measurement of crushed zone pressure, PhD Thesis, Golden: Colorado School of Mines, USA.
Rostami, J., 2013, Study of pressure distribution within the crushed zone in the contact area between rock and disc cutter,?International Journal of Rock Mechanics and Mining Sciences, 57, 172-186.
Rostami, J. and Ozdemir, L., 1993, A new model for performance prediction of hard rock TBMs. In: Proceedings of Rapid?Excavation and Tunneling Conference, USA, pp. 794-809.
Tumac, D. and Balci, C., 2015, Investigations into the cutting characteristics of CCS type disc cutters and the comparison between?experimental, theoretical and empirical force estimations, Tunnelling and Unerground Space Technology, 45, 84-98.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.