NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.24 no.5, 2023년, pp.52 - 62
김수환 (경희대학교 건축공학과) , 김선국 (경희대학교 건축공학과) , 서상욱 (가천대학교 건축공학과) , 김상철 (경희대학교 건축공학과)
The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by e...
Abanda, F.H., Kamsu-Foguem, B., and Tah, J.H.M. (2017a).?"Bim - new rules of measurement ontology for?construction cost estimation." Engineering Science and?Technology, an International Journal, 20(2), pp. 443-459.
Ahn. Y., Song. K., and Heo. J. (2003). "Improving the Accuracy of Screening of Cost Estimating in Early?Construction Project Phase." Journal of the Architectural?Institute of Korea Structure & Construction, 19(11), pp.?133-140.
British Standard. (2020). BS Shape Codes 2020.
Choi, J., Lee, J., Yoon, H,. Park. J., Hwang, Y., and Kim, D.?(1991). "A Study of Automated Quantity Calculation?from Design Drawings, I." Construction Technology?Information System, (May. 25, 2023).
Ergen, F., and Bettemir, O.H. (2022). "Development of?BIM software with quantity take-off and visualization?capabilities." Journal of Construction Engineering,?Management & Innovation, 5(1), pp. 1-14.
Ham, C., Park, J., Park, J., Jeong, J., and Kim, I. (1999). "A?Study on the Development of Shop Drawings and Bar-Bending Schedule Automation System for Apartment?Housings." Journal of the Korean Institute of Architects,?15(.8), pp. 111-119.
Jeong, K., and Lim, N. (2013). "A basic study on the?reduction of loss rate of the reinforcing steel and?quantity using of object-oriented cad-based program."?Korean Association of Architectural Societies, 15(5), pp.?251-258.
Kim. T., Hong. C., and Kim. S. (2003). "Algorithm for the?Reinforced Concrete Framework Materials Take-off." Korean Journal of Construction Engineering and?Management, KICEM, 4(1), pp. 114-121.
Kim, S., and Lim, C. (2007). "A Study on the Estimate Cost?Model for Concrete Structural Frame Work in the?High-Rise Residential-Commercial Complex Building."?Architectural Institute Of Korea, 23(7), pp. 151-159.
Kim S., Yoon S., Chin S., and Kim T. (2009). "A Development?of Automated Modeling System for Apartment Interior?to Improve Productivity of BIM-based Quantity Take-Off." Journal of the Architectural Institute of Korea?Structure & Construction, 25(9), pp. 133-143.
Kim, J., Lee, H., Park, M., Kim, H., and Hwang, S. (2010).?"A Method for the Development of Rebar Quantity?Take-Off (QTO) Efficiency Using BIM." Proceedings of?KICEM Annula Conference, KICEM, 13, pp. 375-377.
Kim, C. (2016). "Review the usability rebar quantity take-off function of Reinforcement concrete frame using?Builder Hub." Journal of the Korea Concrete Institute,?28(2), pp. 555-556.
Kim, D., Lim, C., Liu, Y., and Kim, S. (2019). "Automatic?estimation system of building frames with integrated?structural design information (AutoES)." Iranian Journal?of Science and Technology, Transactions of Civil?Engineering, 44(4), pp. 1145-1157.
Kim, D., Lim, C., Liu, Y., and Kim, S. (2020). "Automatic?Estimation System of Building Frames with Integrated?Structural Design Information (AutoES)." Iranian?Journal of Science and Technology, Transactions of?Civil Engineering, 44(4), pp. 1145-1157.
Kwon, K. (2023). "A Study on the Development of?Optimization Algorithms for Near Zero Rebar Cutting?Waste Rate (N0RCW)." Doctoral Dissertation, Kyung?Hee university, p. 45.
Lee, J., Kim, J., Kim, Y., Moon, S., and Jeon, Y. (1996).?"Research on development of rebar quantity calculation?and loss rate optimization system." Proceedings of the?Spring Conference of the Korean Institute of Architects?(Structural Systems), 16(1), pp. 457-460.
Ministry of Land, Infrastructure, and Transport Technology?Innovation Division. (2022). Revisions to the Design?Criteria for Concrete Structures (KDS 14 20 00) and?Standard Specifications for Concrete Structures (KDS?14 20 00).
Park, H.. Lee, Y., Lee, S., and Kang, T. (2008). "Development?of automatic quantity take-off system for reinforcing?bars including installation location information." Journal?of the Korean Society of Architects and Engineers, 8(2),?pp. 63-70.
Park Y., Won S., Han Ch., and Lee J. (2011). "A Study on?3D BIM Collaborative Approximate Estimating Model?of Structural Work for Apartment Projects." Journal?of the Architectural Institute of Korea Structure &?Construction, 27(6), pp. 123-130.
Song, C., Kim, C., Lee, S., and Choi, H. (2016). "Establishment?of rebar quantity estimation in BIM-based initial?design phase." Journal of the Computational Structural?Engineering Institute of Korea, 29(5), pp. 447-454.
Sung, S., Lim, C., and Kim, S. (2015). "Basic study about?Automatic Rebar Quantity Estimation Integrated with?Structural Design Information." The Korea Institute of?Building Construction, 15(1), pp. 109-110
Yoon, J., Cho, H., Lee, J., Shin, J., and Kim, E. (2020). "A?Comparison of Quantity Take-Offs of RC Structures?based on BIM." Journal of the Computational Structural?Engineering Institute of Korea, 33(1), pp. 35-44.
Yun, S. (2021). "Artificial Intelligence based Conceptual?Cost Estimation at Schematic Design Stage." Journal of?the Architectural Institute of Korea, 41(2), pp. 717-717.?
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.