최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of construction engineering and management, v.136 no.10, 2010년, pp.1140 - 1153
AbouRizk, Simaan (Professor, Dept. of Civil and Environmental Engineering, Hole School of Construction Engineering and Management, Univ. of Alberta, 3-014 Markin)
초록이 없습니다.
AbouRizk S. (2009). “Framework for highly integrated interoperable construction simulation environments.” ICCEM-ICCPM2009 Korea Institute of Construction Engineering and Management Seoul.
AbouRizk, Simaan M., Dozzi, S. Peter. Application of Computer Simulation in Resolving Construction Disputes. Journal of construction engineering and management, vol.119, no.2, 355-373.
AbouRizk S. and Hajjar D. (1996). “Productivity improvement for construction.” Technical Rep NSERC/PCL North American Construction Lafarage Canada Inland Construction Alberco O. J. Pipelines Edmonton Alberta.
AbouRizk S. M. (1990). “Input modeling for construction simulation.” Ph.D. thesis Purdue Univ. West Lafayette Ind.
Analysis of productivity on a tunnel operation using computer simulation AbouRizk S. 1997
Agbulos, Albert, Mohamed, Yasser, Al-Hussein, Mohamed, AbouRizk, Simaan, Roesch, John. Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Journal of construction engineering and management, vol.132, no.3, 291-299.
Al-Battaineh M. (2009). “Scenario-based planning for tunneling construction.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
Alvanchi A. Lee S. and AbouRizk S. (2009). “Incorporating context level parameters to improve operation analysis in steel fabrication shops.” ICCEM-ICCPM2009 Korea Institute of Construction Engineering and Management Seoul.
Azimi R. Lee S. and AbouRizk S. (2009). “Integrated project monitoring and control for steel construction.” Joint Int. Conf. on Construction Engineering and Management and Construction Project Management (ICCEM-ICCPM) Korea Institute of Construction Engineering and Management Seoul.
Chang D. Y. and Carr R. I. (1987). “RESQUE: A resource oriented simulation system for multiple resource constrained processes.” Proc. 1987 PMI Seminar/Symp. Project Management Institute Newton Square Pa. 4-19.
Chung, Tae Hwan, Mohamed, Yasser, AbouRizk, Simaan. Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project. Journal of construction engineering and management, vol.132, no.8, 882-894.
El-Ghandour W. (2007). “Integrated information-based construction simulation system.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
Er K. C. Fernando S. AbouRizk S. and Ruwanpura J. (2000). “Selecting the best tunnel construction for the 1st stage of the SESS tunnel using simulation.” 7th Annual Construction Research Forum Hole School of Construction Edmonton Alta. Canada.
Ferrar J. M. (2002). “Development of a lean approach in simulation using surface works operations of road construction.” MSc thesis Univ. of Alberta Edmonton Alta. Canada.
Hajjar, Dany, AbouRizk, Simaan M.. Unified Modeling Methodology for Construction Simulation. Journal of construction engineering and management, vol.128, no.2, 174-185.
J. Constr. Div. Halpin D. W. 489 103 3 1977 10.1061/JCCEAZ.0000712 CYCLONE: Method for modeling of job site processes
MicroCYCLONE user’s manual Halpin D. W. 1990
IEEE. (2001). “Standard for modeling and simulation (M&S) high level architecture (HLA).” Federate Interface Specification 1516.1-2000 IEEE Press New York.
UM-CYCLONE user’s guide Ioannou P. G. 1989
Systems Analysis Modelling Simulation Kamat V. R. 455 2003
Lu, Ming, Anson, Michael, Tang, S. L., Ying, Y. C.. HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. Journal of construction engineering and management, vol.129, no.5, 547-554.
Moghani E. Taghaddos H. Salehi M. AbouRizk S. M. and Mohamed Y. (2009). “Simulation-based schedule enhancement of tower cranes.” CSCE Annual Conf. Canadian Society for Civil Engineering St. John’s NL Canada.
Mohamed, Yasser, Borrego, Davila, Francisco, Luis, Al‐Hussein, Mohamed, AbouRizk, Simaan, Hermann, Ulrich. Simulation‐based scheduling of module assembly yards: case study. Engineering, construction and architectural management, vol.14, no.3, 293-311.
North American Pipeline Inc. (NAPI). (2008). “Suncor firebag pipeline construction simulation.” prepared by DRAXware Inc.
Odeh A. M. Tommelein I. D. and Carr R. I. (1992). “Knowledge-based simulation of construction plans.” Proc. 8th Conf. on Computing in Civil Engineering ASCE New York 1042-1049.
Oloufa, Amr A.. Modeling Operational Activities in Object‐Oriented Simulation. Journal of computing in civil engineering, vol.7, no.1, 94-106.
Paulson Jr., Boyd C., Chan, Weng Tat, Koo, Charlie C.. Construction Operations Simulation by Microcomputer. Journal of construction engineering and management, vol.113, no.2, 302-314.
Peña-Mora, Feniosky, Han, Sangwon, Lee, SangHyun, Park, Moonseo. Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. Journal of construction engineering and management, vol.134, no.9, 701-710.
Shaheen, Ahmed A., Fayek, Aminah Robinson, AbouRizk, Simaan M.. Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering. Canadian journal of civil engineering = Revue canadienne de génie civil, vol.36, no.9, 1478-1490.
Shahin A. (2007). “Simulation of cold weather construction.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
Shi, Jonathan Jingsheng. Activity-Based Construction (ABC) Modeling and Simulation Method. Journal of construction engineering and management, vol.125, no.5, 354-360.
Song L. (2004). “Productivity modeling for steel fabrication projects.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
Van Tol A. A. (2005). “Agent embedded simulation modeling framework for construction engineering and management applications.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
Wang P. (2006). “Production-based large scale construction simulation modeling.” Ph.D. thesis Univ. of Alberta Edmonton Alta. Canada.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.