최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of construction engineering and management, v.139 no.2, 2013년, pp.236 - 246
Kang, Sanghyeok (Research Fellow, Construction and Economy Research Institute of Korea, 11th F. Construction Building 711 Eonjuro, Kangnam-gu, Seoul, 135-701, Republic of Korea) , Seo, Jongwon (formerly, Graduate Research Assistant, Dept. of Civil Engineering, Hanyang Univ., Seoul, 133-791, Korea)
초록이 없습니다.
Atkinson, David M., Deadman, Peter, Dudycha, Douglas, Traynor, Stephen. Multi-criteria evaluation and least cost path analysis for an arctic all-weather road. Applied geography, vol.25, no.4, 287-307.
Fleet production & cost analysis manual Caterpillar 2001
Chan, Albert P. C., Chan, Daniel W. M., Yeung, John F. Y.. Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of construction engineering and management, vol.135, no.11, 1241-1252.
Chang S. Oh Y. Chun H. and Ko J. (2006). “Industrial noise: Current problems and practical plan.” Proc. Korean Society for Noise and Vibration Engineering Conf. Korean Society for Noise and Vibration Engineering Seoul Korea 42-47.
Cheng, M. Y., O'Connor, J. T.. ArcSite: Enhanced GIS for Construction Site Layout. Journal of construction engineering and management, vol.122, no.4, 329-336.
Cheng, Min-Yuan, Yang, Shin-Ching. GIS-Based Cost Estimates Integrating with Material Layout Planning. Journal of construction engineering and management, vol.127, no.4, 291-299.
Choi, Yosoon, Park, Hyeong-Dong, Sunwoo, Choon, Clarke, Keith C.. Multi-criteria evaluation and least-cost path analysis for optimal haulage routing of dump trucks in large scale open-pit mines. International journal of geographical information science : IJGIS, vol.23, no.12, 1541-1567.
Christian, John, Xie, Tian Xing. Improving earthmoving estimating by more realistic knowledge. Canadian journal of civil engineering. Revue canadienne de génie civil, vol.23, no.1, 250-259.
A study of the evaluation plans concerning damage to livestock by noise College of Veterinary Medicine at Seoul National University 2001
Dijkstra, E. W.. A note on two problems in connexion with graphs. Numerische Mathematik, vol.1, no.1, 269-271.
Geo-Processing Dueker K. J. 105 1 2 1979 Land resource information systems: a review of fifteen years experience
Easa, Said M.. Earthwork Allocations with Linear Unit Costs. Journal of construction engineering and management, vol.114, no.4, 641-655.
Using ArcGIS 3D Analyst: ArcGIS 9 ESRI 2004
Using ArcGIS Spatial Analyst: ArcGIS 9 ESRI 2004
J. Constr. Div. Gates M. 395 104 4 1978 10.1061/JCCEAZ.0000796 Optimum location of construction haul roads
Planning and analysis of construction operations Halpin D. W. 1992
Health and Safety Executive. (2008). “Vehicles and edge protection.” 〈http://www.hse.gov.uk/quarries/hardtarget/protection.htm〉 (Apr. 20 2008).
Jayawardane, A. K. W., Harris, F. C.. Further Development of Integer Programming in Earthwork Optimization. Journal of construction engineering and management, vol.116, no.1, 18-34.
Karshenas, Saeed. Truck Capacity Selection for Earthmoving. Journal of construction engineering and management, vol.115, no.2, 212-227.
Korean J. Constr. Eng. Manage. Ko K. 110 5 6 2004 A study on the environmental friendly noise and vibration management method for the construction project
Enforcement decree of the noise and vibration control act Korea Ministry of Environment 2009
Characteristics of noise by construction equipment Korea National Institute of Environmental Research 2003
Korea National Spatial Information Space. (2006). “Digital tophgraphic maps of Gimcheonsi.” 〈https://www.nsic.go.kr〉 (Feb. 02 2006).
Marzouk, Mohamed, Moselhi, Osama. Object-oriented Simulation Model for Earthmoving Operations. Journal of construction engineering and management, vol.129, no.2, 173-181.
Marzouk, Mohamed, Moselhi, Osama. Multiobjective Optimization of Earthmoving Operations. Journal of construction engineering and management, vol.130, no.1, 105-113.
Noise Pollution Clearinghouse. (2010). “Hearing loss and occupational noise library.” 〈http://www.nonoise.org/index.htm〉 (Oct. 17 2010).
Oloufa, Amr A.. Modeling Operational Activities in Object‐Oriented Simulation. Journal of computing in civil engineering, vol.7, no.1, 94-106.
Construction planning equipment and methods Peurifoy R. 2002
The analytical hierarchical process Saaty T. L. 1980
SHI, JINGSHENG, ABOURIZK, SIMAAN M.. AN OPTIMIZATION METHOD FOR SIMULATING LARGE COMPLEX SYSTEMS. Engineering optimization, vol.25, no.3, 213-229.
Smith, S. D., Osborne, J. R., Forde, M. C.. Analysis of Earth-Moving Systems Using Discrete-Event Simulation. Journal of construction engineering and management, vol.121, no.4, 388-396.
Son, Jaeho, Mattila, Kris G., Myers, Donald S.. Determination of Haul Distance and Direction in Mass Excavation. Journal of construction engineering and management, vol.131, no.3, 302-309.
System for Automated Geoscientific Analyses. (2012). “SAGA for MS Windows.” 〈http://www.saga-gis.org/en/index.html〉 (Feb. 20 2012).
Guidelines for mine haul road design Tannant D. D. 2001
Haul road inspection handbook U.S. Dept. of Labor 1999
U.S. Geological Survey. (2012). “Map Locator and Downloader.” 〈http://store.usgs.gov〉 (Feb. 20 2012).
Varghese, K., O'Connor, J. T.. Routing Large Vehicles on Industrial Construction Sites. Journal of construction engineering and management, vol.121, no.1, 1-12.
Xu, Jianping, Lathrop Jr., Richard G.. Improving simulation accuracy of spread phenomena in a raster-based Geographic Information System. International journal of geographical information systems, vol.9, no.2, 153-168.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.