In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the pr...
In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.
In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.
참고문헌 (7)
Hai Chao Ding Dongguan Science and Technology Museum project risk management[D]. master thesis of Huazhong university of science and technology, (2006),In Chinese.
Hongtao Jiao. Hang Fung Yuen building of engineering science and technology security risk management[D]. master's degree thesis of Beijing university of posts , (2007) ,In Chinese.
Jianmin Teng. risk management theory and its Application to construction project in Yantai city[D]. master thesis of Huazhong university of science and technology, (2006), In Chinese.
Chapman C.B. Cooper, D.F. Risk Analysis for Large Projects: Models, Methods and Cases. John Wiley&Sons,(1987).
Jefrey Wilks, Robert J. Davis. Risk management for scuba diving operators on Australia's Great Barrier Reef,(2000)(06):591-593. 10.1016/s0261-5177(00)00008-x
※ AI-Helper는 부적절한 답변을 할 수 있습니다.