This paper describes on the measurement of the deck vibration produced by the main engine vibration of stern trawler MjS SAE-BA-DA (2,275GT, 3,600PS) while the ship is cruising and drifting. The obtained results are as follows; 1. The deck vibration level was the highest point at vertical line w...
This paper describes on the measurement of the deck vibration produced by the main engine vibration of stern trawler MjS SAE-BA-DA (2,275GT, 3,600PS) while the ship is cruising and drifting. The obtained results are as follows; 1. The deck vibration level was the highest point at vertical line which pass main engine and the lowest point at vertical line which pass top bridge while the crusing. 2. The vibration source level of the main engine, screw shaft and screw propeller were respectively 110, 90 and 80% while the crusing. 3. The main deck vibration pressure level at the check points 2, 20, 30, 40, 60, 70, 80, 86m from the bow to stern was respectively 9, 8, 7, 10, 22, 45, 18, 23%. 4. The frequency distributions of the rr.ain engine, screw shaft, screw propeller vibration were from 3 Hz to 10 KHz, predominant frequency was 1 KHz, each vibration accelration the highest level were respectively 1. 3, 0.8, 0.5 $mm/s^2.$ 5. The predominant frequency distributions of the main deck, second deck, bridge deck and top bridge deck-s vibration were from 10 to 30 Hz, and each vibration accelration level were respectively 0.7, 0.05, 0.07, 0.04 $mm/s^2.$
This paper describes on the measurement of the deck vibration produced by the main engine vibration of stern trawler MjS SAE-BA-DA (2,275GT, 3,600PS) while the ship is cruising and drifting. The obtained results are as follows; 1. The deck vibration level was the highest point at vertical line which pass main engine and the lowest point at vertical line which pass top bridge while the crusing. 2. The vibration source level of the main engine, screw shaft and screw propeller were respectively 110, 90 and 80% while the crusing. 3. The main deck vibration pressure level at the check points 2, 20, 30, 40, 60, 70, 80, 86m from the bow to stern was respectively 9, 8, 7, 10, 22, 45, 18, 23%. 4. The frequency distributions of the rr.ain engine, screw shaft, screw propeller vibration were from 3 Hz to 10 KHz, predominant frequency was 1 KHz, each vibration accelration the highest level were respectively 1. 3, 0.8, 0.5 $mm/s^2.$ 5. The predominant frequency distributions of the main deck, second deck, bridge deck and top bridge deck-s vibration were from 10 to 30 Hz, and each vibration accelration level were respectively 0.7, 0.05, 0.07, 0.04 $mm/s^2.$
※ AI-Helper는 부적절한 답변을 할 수 있습니다.