최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기산업공학 = IE Interfaces, v.15 no.4, 2002년, pp.325 - 337
나혁준 (고려대학교 산업시스템정보공학과) , 백종관 (고려대학교 정보통신기술공동연구소) , 김성식 (고려대학교 산업시스템정보공학과)
In this study we consider the problem of production planning of TFT-LCD(Thin Film Transistor - Liquid Crystal Display) production factory. Due to the complexities of the TFT-LCD production processes, it is difficult to schedule the production planning, and the study about automated scheduler is insu...
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
Baek, J-K, Baek, J-G. and Kim, S-S., "Scheduling Scheme for FAB Process in Semiconductor Factory", Journal of the Korean Imrif1lte of Industrial Engineers, 28(4), 416-425
Fowler, J. W., Phillips, D. T. and Hogg, G. L. (1992), Real-Time Control of Multiproduct Bulk Service Semiconductor Manufacturing Process, IEEE Transactions on Semiconductor Manufacturing, 5, 158-163
Glassey, C. R and Resende, M.G. C.(1988), A Scheduling Rule for Job Release in Semiconductor Fabrication, Operation Research Letters, 7, 213-217
Glassey, C.R and Resende, M G. C.(1988), Closed-Loop Job Release Control for VLSI Circuit Manufacturing, IEEE Transactions on Semiconductor Manufacturing, 1(1), 36-46
Jeong, B., Kim, S. and Lee, Y. (2001), An assembly scheduler for TFTLCD manufacturing, Computers & Industrial Engineering, 41, 37-58
Johri, P. K. (1993), Practical Issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication, Journal of Manufacturing Systems, 12(6), 474-485
Joshi, M.(1990), Making wafers in the JIT style, Proceedings of Advanced Semiconductor Manufacturing Conference and Workshop 1990, IEEE/SEMI, Danvers, MA, USA
Leachman, R. C. (1994), Production Planning and Scheduling Practices Across the Semiconductor Industry, ESRC Report 94-29, Engineering Systems Research Center, University of California, Berkeley
Leachman, R. C. (1994), The Competitive Semiconductor Manufacturing Survey: Second Report on Result of the Main Phase, CSM-08 Report
Lee, C. Y., Uzsoy, R and Martin-Vega, L. A.(1992), Efficient Algorithms for Scheduling Batch Processing Machines, Operations Research, 40, 764-775
Levitt, M. E. and Abraham, J. A.(1990), Just-in-time methods for semiconductor manufacturing, Proceedings of Advanced Semiconductor Manufacturing Conference and Workshop 1990, IEEE/SEMI, Danvers, MA, USA,3-9
Lou, S.X. C. and Kager, P. W.(1989), A Robust Production Control Policy for VLSI Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 2(4), 159-164
Murty, S. V. and Bienvenu, J. W.(1995), Global Planning at Harris Semiconductor, Proceedings of International Symposium on Semiconductor Manufacturing, Texas, USA, 18-23
Perez, R A., Koh, S.W. and Savell, D. V.(1989), Scheduling Semiconductor Wafer Production: An Expert System Implementation, IEEE Expert, 9-15
Song, W.(2000), A Study on Mater Production Schedule for TFT-LCD factory, a thesis for a master degree, Department of Industrial Systems and Information Engineering, Korea University
Spearman, M. L., Woodruff, D. L. and Hopp, W. J. (1990), CONWIP: A Pull Alternative to Kanban, International Journal of Production Research, 28(5), 879-894
Uzsoy, R, Lee, C. Y. and Martin-vega, L.A.(1994), A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part 2: Shop-Floor Control, IIE Transactions on Scheduling and Logistics, 26(5). 44-5
Uzsoy, R, Lee, C. Y. and Martin-vega, L. A.(1992), A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part 1: System Characteristics, Performance Evaluation, and Production Planning, IIE Transactions on Scheduling and Logistics, 24(4), 47-61
Wein, L. M.(1988), Scheduling Semiconductor Wafer Fabrication, IEEE Transaaions on Semiconductor Manufacturing, 1(3), 115-129
Weng, W. and Leachman, R C.(1993), An Improved Methodology for Real-Time Production Decisions at Batch-Process Work Stations, IEEE Transactions on Semiconductor Manufacturing, 6, 219-225
※ AI-Helper는 부적절한 답변을 할 수 있습니다.