최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기대한산업공학회지 = Journal of the Korean Institute of Industrial Engineers, v.34 no.4, 2008년, pp.414 - 424
김화중 (인하대학교 물류전문대학원) , 이동호 (한양대학교 산업공학과)
Disassembly scheduling is the problem of determining the quantity and timing of disassembling used or end-of-life products while satisfying the demand of their parts or components over a given planning horizon. This paper considers the two-level disassembly structure that describes a direct relation...
Aggarwal, A. and Park, J. K. (1993), Improved Algorithms for Economic Lot Size Problems, Operations Research, 41, 549-571
Boothroyd, G. and Alting, L. (1992), Design for Assembly and Disassembly, CIRP Annals-Manufacturing Technology, 41, 625-636
Erdos, G., Kis, T., and Xirouchakis, P. (2001), Modeling and Evaluating Product End-of-life Options, International Journal of Production Research, 39, 1203-1220
Federgruen, A. and Tzur, M. (1991), A Simple Forward Algorithm to Solve General Dynamic Lot sizing Models with n periods in O(n log n) or O(n) Time, Management Science, 37, 909-925
Gupta, S. M. and McLean, C. R. (1996). Disassembly of Products, Computers and Industrial Engineering, 31, 225-228
Gupta, S. M. and Taleb, K. N. (1994), Scheduling Disassembly. International Journal of Production Research, 32, 1857- 1886
Inderfurth, K. and Langella, I. M. (2006), Heuristics for Solving Disassemble-to-Order Problems with Stochastic Yields. OR Spectrum, 28, 71-97
Jovane, F., Alting, L., Armoillotta, A., Eversheirm, W., Feldmann, K., Seliger, G., and Roth, N. (1993), A Key Issue in Product Life Cycle : Disassembly, CIRP Annals-Manufacturing Technology, 42, 651-658
Kang, J-G., Lee, D-H., Xirouchakis, P., and Lambert, A. J. D. (2002), Optimal Disassembly Sequencing with Sequence Dependent Operation Times Based on the Directed Graph of Assembly States, Journal of the Korean Institute of Industrial Engineers, 28, 264-273
Kang, J-G., Lee, D-H., Xirouchakis, P., and Persson, J-G. (2001), Parallel Disassembly Sequencing with Sequence- Dependent Operation Times, CIRP Annals-Manufacturing Technology, 50, 343-346
Kang, J-G., Lee, D-H., and Xirouchakis, P. (2003), Disassembly Sequencing with Imprecise Data : A Case Study, International Journal of Industrial Engineering, 10, 407-412
Kang, J-G. and Xirouchakis, P. (2006), Disassembly Sequencing for Maintenance : A Survey, Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 220, 1697-1716
Kim, H-J., Lee, D-H., Xirouchakis, P., and Zust, R. (2003), Disassembly Scheduling with Multiple Product Types, CIRP Annals-Manufacturing Technology, 52, 403-406
Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006a), Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality, International Journal of Production Research, 44, 195-212
Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006b), A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints, Journal of the Operational Research Society, 57, 1231-1240
Kim, H-J., Lee, D-H., and Xirouchakis, P. (2007), Disassembly Scheduling : Literature Review and Future Research Directions, International Journal of Production Research, 45, 4465-4484
Kim, J-G., Jeon, H-B., Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006c), Disassembly Scheduling with Capacity Constraints : Minimizing the Number of Products Disassembled. Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, Journal of Engineering Manufacture, 220, 1473-1481
Kongar, E. and Gupta, S. M. (2006), Disassembly to Order System Under Uncertainty, Omega-International Journal of Management Science, 34, 550-561
Lambert, A. J. D. (2003), Disassembly Sequencing : A Survey. International Journal of Production Research, 41, 3721-3759
Lambert, A. J. D. and Gupta, S. M. (2005), Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling, CRC Press, Florida, USA
Langella, I. M. (2007), Heuristics for Demand-Driven Disassembly Planning, Computers and Operations Research, 34, 552-577
Lee, D-H., Kang, J-G., and Xirouchakis, P. (2001), Disassembly Planning and Scheduling : Review and Further Research, Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 215, 695-710
Lee, D-H., Kim, H-J., Choi, G., and Xirouchakis, P. (2004), Disassembly Scheduling : Integer Programming Models. Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 218, 1357-1372
Lee, D-H. and Xirouchakis, P. (2004), A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure, Journal of the Operational Research Society, 55, 287-297
Lee, D-H., Xirouchakis, P., and Zust, R. (2002), Disassembly Scheduling with Capacity Constraints, CIRP Annals-Manufacturing Technology, 51, 387-390
Moore, K. E., Gungor, A., and Gupta, S. M. (2001), Petri Net Approach to Disassembly Process Planning for Products with Complex AND/OR Precedence Relationships, European Journal of Operational Research, 135, 428-449
Neuendorf, K-P., Lee, D-H., Kiritsis, D., and Xirouchakis, P. (2001), Disassembly Scheduling with Parts Commonality Using Petri-nets with Timestamps, Fundamenta Informaticae, 47, 295-306
O'Shea, B., Grewal, S. S., and Kaebernick, H. (1998), State of the Art Literature Survey on Disassembly Planning, Concurrent Engineering : Research and Applications, 6, 345-357
Richter, K. and Sombrutzki, M. (2000), Remanufacturing Planning for the Reverse Wagner/Whitin Models. European Journal of Operational Research, 121, 304-315
Richter, K. and Weber, J. (2001), The Reverse Wagner/Whitin Model with Variable Manufacturing and Remanufacturing Cost, International Journal of Production Economics, 71, 447-456
Santochi, M., Dini, G., and Failli, F. (2002), Computer Aided Disassembly Planning : State of the Art and Perspectives, CIRP Annals- Manufacturing Technology, 51, 1-23
Taleb, K. N. and Gupta, S. M. (1997), Disassembly of Multiple Product Structures, Computers and Industrial Engineering, 32, 949-961
Taleb, K. N., Gupta, S. M., and Brennan, L. (1997), Disassembly of Complex Product Structures with Parts and Materials Commonality, Production Planning and Control, 8, 255-269
Wagelmans, A., Hoesel, S. V., and Kolen, A. (1992), Economic Lot Sizing : An O(n log n) Algorithm that Runs in Linear Time in the Wagner-Whitin Case, Operations Research, 40, 145-156
Wagner, M. H. and Whitin, T. M. (1958), Dynamic Version of the Economic Lot-Sizing Model, Management Science, 5, 89-96
Xirouchakis, P. and Kiritsis, D. (1996), A Generic Petri Net Model for Disassembly Planning Processes, Proceedings of Tools and Methods for Concurrent Engineering, 523-529
Xirouchakis, P. and Kiritsis, D. (1997), Petri Net Model for Disassembly Process Planning, Proceedings of ASME Mechanical Engineering, 255-262
Zabel, E. (1964), Some Generalizations of an Inventory Planning Horizon Theorem, Management Science, 10, 465-471
해당 논문의 주제분야에서 활용도가 높은 상위 5개 콘텐츠를 보여줍니다.
더보기 버튼을 클릭하시면 더 많은 관련자료를 살펴볼 수 있습니다.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
Free Access. 출판사/학술단체 등이 허락한 무료 공개 사이트를 통해 자유로운 이용이 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.