최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기대한산업공학회지 = Journal of the Korean Institute of Industrial Engineers, v.38 no.4, 2012년, pp.262 - 275
서정대 (가천대학교 산업경영공학과)
This paper develops a multistage scheduling algorithm for the module operation of the LCD(Liquid Crystal Display) production systems and tests the efficiency of the proposed algorithm. The module operation is a multistage form composed of multiple sub operations of processes, and each stage is consi...
Akcali, E. and Uzsoy, R. (2000), A Sequential Solution Methodology for Capacity Allocation and lot Scheduling Problems for Photolithography, Electronics Manufacturing Technology Symposium (Twenty-Sixth IEEE/CPMT International), 374-381.
Chung, J. and Jang, J. (2009), The WIP Balancing Procedure Increasing Throughput for Semiconductor Fabrication, IEEE Transactions on Semiconductor Manufacturing, 22(3), 381-390
Gartland, K., Godding, G., Hodges, B., Muzumbar, N., Hohkibara, S., Kono, S., Honma, M., and Inoue, G. (2000), Scheduler/dispatcher user requirements, International SEMATECH, Technology Transfer # 00063966A-TR.
Gendreau, M. (2002), An introduction to tabu search, In Handbook of Metaheuristics, Kluwer, 37-54.
Glover, F. W. and Laguna, M. (1998), Tabu Search, Kluwer Academic Publishers.
Ho, Y. C. and Su, T. S. (2010), "The Machine Layout Within a TFTLCD Bay with an In-line Stocker System and an RGV System," Computers and Industrial Engineering (CIE), 2010 40th International Conference on, 1-6.
Jang, J., Suh, J., and Ferreira, P. (2001a), An AGV Routing Policy Reflecting the Current and Future State of Semiconductor and LCD Production Lines, International Journal of Production Research, 39(17), 3901-3921.
Jeong, B., Sim, S. B., Jeong, H. S., and Kim, S. W. (2002), "An Availableto- Promise System for TFT LCD Manufacturing in Supply Chain," Computers and Industrial Engineering, 43(1-2), 191-212.
Koo, P.-H., Jang, J., and Suh, J. (2005), Vehicle Dispatching for Highly Loaded Semiconductor Production Considering Bottleneck Machines First, International Journal of Flexible Manufacturing Systems, 17(1), 23-38.
Lee, Y. H., Park, J., and Kim, S. (2002), Experimental Study on Input and Bottleneck Scheduling for a Semiconductor Fabrication Line, IIE Transactions, 34, 179-190.
Leu, J. D., Huang, L. T., and Chen, C. Y. (2010), "A MRP-II Based Planning Method for the TFT-LCD Manufacturing," Computers and Industrial Engineering (CIE), 2010 40th International Conference on, 1-8.
Liao, D. Y., Chang, S. C., Pei, K. W., and Chang, C. M. (1996), Daily Scheduling for R&D Semiconductor Fabrication, IEEE Transactions on Semiconductor Manufacturing, 9(4), 550-561.
Lin, J. T., Chen, T. L., and Lin, Y. T. (2006), "A Hierarchical Planning and Scheduling Framework for TFT-LCD Production Chain," Service Operations and Logistics, and Informatics, 2006. SOLI '06. IEEE International Conference on, 711-716.
Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. (1994), Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants, IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388.
Pai, P. F., Lee, C. E., and Su, T. H. (2004), A Daily Production Model for Wafer Fabrication, International Journal of Advanced Manufacturing Technology, 23, 58-63.
Park, B. C., Choi, B. K., Park, E. S., Kim, B. H., and Lee, J. H. (2008), "Simulation Based Planning and Scheduling System for TFT-LCD Fab," Proceedings of the 2008 Winter Simulation Conference, Miami, FL, TX, 2271-2276.
Pinedo, M. L. (2008), Scheduling : Theory, Algorithms, and Systems, 3rd Edition, Springer.
Shen, Y. and Leachman, R. C. (2003), Stochastic Wafer Fabrication Scheduling, IEEE Transactions on Semiconductor Manufacturing, 16(1), 2-14.
Suh, J., Jang, J., and Koo, P. H. (2003), Development of a Look-ahead AGV Controller for a Clean Bay Operation, International Journal of Industrial Engineering, 10(4), 547-554.
Talbi, E.-G. (2009), Metaheuristics : From Design to Implementation, Wiley.
Tsai, K. and Wang, S. (2009), "Multi-Site Available-to-Promise Modeling for Assemble-to-order Manufacturing : An Illustration on TFTLCD Manufacturing," International Journal of Production Economics, 117(1), 174-184.
Uzsoy, R., Lee, C. Y., and Martin-vega, A. L. (1992), A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part 1 : System Characteristics, Performance Evaluation and Production Planning, IIE Transactions, 24(4), 47-60.
Uzsoy, R., Lee, C., and Martin-Vega, L. A. (1994), A Review of Production Planning and Scheduling Models in the Semiconductor Industry part II : Shop-Floor Control, IIE transactions, 26(5), 44-55.
Vargas-Vilamil, F. D., Rivera, D. E., and Kempf, K. G. (2003), A Hierarchical Approach to Production Control of Reentrant Semiconductor Manufacturing Lines, IEEE Transactions on control systems technology, 11(4), 578-87.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
Free Access. 출판사/학술단체 등이 허락한 무료 공개 사이트를 통해 자유로운 이용이 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.