최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.22 no.2, 2021년, pp.97 - 105
박보성 (충북대학교 건축공학과) , 김옥규 (충북대학교 건축공학과)
The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related...
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
Byambadorj, T. (2012). "A Study of Factors that Caused 'CM at Risk's Inactivity and Proposal for the System Improvement." M.S. Dissertation, Department of Architecture, Soongsil University, pp. 1-44.
Cho, H.K. (2011). "Construction Management Services during Pre-Construction Stages." M.S. Dissertation, Department of Architectural Engineering, Sejong University, pp. 37-60.
Han, J.H. (2019). "Risk Factors to Implement CM at Risk Pilot Project." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 19-47.
Han, T.H. (2018). "Innovation of Pre-Construction Service Based Construction Production Method." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 41-45.
Han, T.H., and Park, J.H. (2017). "A Possibility of Pre-Construction Service and its Core Technologies in Domestic Construction Market." 建築, AIK, 61(5), pp. 39-46.
Kim, J.G. (2008). "The Strategy of the General Contractor Under the Circumstances of CM at Risk." M.S. Dissertation, Department of Architectural Engineering, Dong-A University, pp. 35-50.
Kim, J.H. (2020). "PRECON." MID, pp. 113-234.
Kim, J.H. (2010). "An Analysis about Factors Affecting Inactiveness of CM at Risk at Korean Construction Industry." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 13-39.
Koh, S.H. (2018). "Comparison Analysis of BIM Use and Levelin the Domestic and Overseas BIM Projects according to Project Delivery System." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 5-28.
Koo, S.K. (2017). "Risk Factor Assessment for Guaranteed Maximum Price Contract in CM at Risk." M.S. Dissertation, Department of Construction Management, University of Seoul, pp. 38-94.
Lee, C.J., Lee, S.H., and Ahn, Y.H. (2017). "Benchmarking of US General Contractor's Pre -construction Services for a CM at Risk Project to Improve Contractor's Competitiveness." Journal of the Korea Institute for Structural Maintenance and Inspection, JKSMI, 21(5), pp. 9-18.
Lee, K.D. (2015). "A Study on the Analysis of main Barriers for the Activation of CM at Risk in the Domestic Construction Industry." M.S. Dissertation, Department of Architectural Engineering, Kyungpook National University, pp. 47-58.
Park, H.K. (2011). "A Study on the Effect of Pre-Detecting Errors Using BIM in the Pre- Construction Phase." M.S. Dissertation, Department of Architectural Engineering, Yonsei University, pp. 50-75.
Park, S.J. (2020). "Improving the Performance of Construction Projects Introducing CM at Risk." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 29-40.
Shin, S.H. (2004). "A Plan for Application of CM at Risk to the Public Construction Sector in Korea." M.S. Dissertation, Department of Construction Management, University of Seoul, pp. 35-107.
Son, K.N. (2018). "Importance Analysis of Obstacle Factors on the CM at Risk Projects using AHP Method." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 15-67.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.