최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.22 no.1, 2021년, pp.36 - 46
윤성부 (서울대학교 건축학과) , 박문서 (서울대학교 건축학과) , 정민혁 (서울대학교 건축학과) , 현호상 (서울주택도시공사 SH도시연구원) , 안수호 (서울대학교 건축학과)
With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular constructi...
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
Abdelmegid, M.A., Shawki, K.M., and Abdel-Khalek, H. (2015). "GA optimization model for solving tower crane location problem in construction sites." Alexandria Engineering Journal, 54(3), pp. 519-526.
Al-Hussein, M., Niaz, M.A., Yu, H., and Kim, H. (2006). "Integrating 3D visualization and simulation for tower crane operations on construction sites." Automation in construction, 15(5), pp. 554-562.
Briskorn, D., and Dienstknecht, M. (2019). "Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference." European Journal of Operational Research, 273(1), pp. 160-174.
Deb, K., Pratap, A., Agarwal, S., and Meyarivan, T.A.M.T. (2002). "A fast and elitist multiobjective genetic algorithm: NSGA-II." IEEE transactions on evolutionary computation, 6(2), pp. 182-197.
Han, S., Bouferguene, A., Al-Hussein, M., and Hermann, U. (2017). "3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites." Journal of Construction Engineering and Management, 143(9), 04017060.
Han, S., Hasan, S., Bouferguene, A., Al-Hussein, M., and Kosa, J. (2018). "An integrated decision support model for selecting the most feasible crane at heavy construction sites." Automation in Construction, 87, pp. 188-200.
Hasan, S., Bouferguene, A., Al-Hussein, M., Gillis, P., and Telyas, A. (2013). "Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects." Automation in Construction, 31, pp. 255-264.
Huang, C., Wong, C.K., and Tam, C.M. (2011). "Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Automation in Construction, 20(5), pp. 571-580.
Huang, C., Li, R., Fu, Y., and Ireland, V. (2019). Optimal Selection and Location of Tower Crane for the Construction of Prefabricated Buildings with Different Prefabrication Ratios. Journal of Engineering Science & Technology Review, 12(6).
Irizarry, J., and Karan, E.P. (2012). "Optimizing location of tower cranes on construction sites through GIS and BIM integration." Journal of information technology in construction (ITcon), 17(23), pp. 351-366.
Ji, Y., and Leite, F. (2020). "Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming." Journal of Construction Engineering and Management, 146(3), 04020007.
Kang, S.C., and Miranda, E. (2008). "Computational methods for coordinating multiple construction cranes." Journal of Computing in Civil Engineering, 22(4), pp. 252-263.
Khodabandelu, A., Park, J., and Arteaga, C. (2020). "Crane operation planning in overlapping areas through dynamic supply selection." Automation in Construction, 117, 103253.
Kim, Y., and Park, C. (2008). "Optimal Design of Residential Ventilation Systems using Integration of Genetic Algorithm, Pareto Optimality and CONTAMW 2.4." Journal of the Architectural Institute of Korea Planning & Design, 24(1), pp. 237-245.
Lee, D., Hyun, H., Park, M., and Lee, H. (2016). "Tower Crane Location and Capacity Selection Model for the Mid-to-high-rise Modular Construction." Journal of the Architectural Institute of Korea Structure & Construction, 32(11), pp. 27-36.
Marzouk, M., and Abubakr, A. (2016). "Decision support for tower crane selection with building information models and genetic algorithms." Automation in Construction, 61, pp. 1-15.
Moussavi Nadoushani, Z.S., Hammad, A.W., and Akbarnezhad, A. (2017). "Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs." Journal of Construction Engineering and Management, 143(1), 04016089.
Olearczyk, J., Al-Hussein, M., and Bouferguene, A. (2014). "Evolution of the crane selection and on-site utilization process for modular construction multilifts." Automation in construction, 43, pp. 59-72.
Shapira, A., and Goldenberg, M. (2005). "AHP-based equipment selection model for construction projects." Journal of construction engineering and management, 131(12), pp. 1263-1273.
Shapira, A., and Goldenberg, M. (2007). "Soft" considerations in equipment selection for building construction projects. Journal of construction engineering and management, 133(10), pp. 749-760.
Taghaddos, H., Hermann, U., and Abbasi, A. (2018). "Automated Crane Planning and Optimization for modular construction." Automation in Construction, 95, pp. 219-232.
Yeoh, J.K., and Chua, D.K. (2017). "Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach." Journal of Construction Engineering and Management, 143(8), 04017029.
Yoon, J., Lee, J., and Kim, D. (2013). "Feature Selection in Multi-label Classification using NSGA-II Algorithm." Journal of KISS : Software and Applications, 40(3), pp. 133-140
Younes, A., and Marzouk, M. (2018). "Tower cranes layout planning using agent-based simulation considering activity conflicts." Automation in construction, 93, pp. 348-360.
Zhang, P., Harris, F.C., and Olomolaiye, P.O. (1996). "A computerbased model for optimizing the location of a single tower crane: Authors claim 20-40% of hook horizontal travelling time can be saved if located at the position recommended by the model." Building research and information, 24(2), pp. 113-123.
Zhang, P., Harris, F.C., Olomolaiye, P.O., and Holt, G.D. (1999). "Location optimization for a group of tower cranes." Journal of construction engineering and management, 125(2), pp. 115-122.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.