최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.22 no.6, 2021년, pp.55 - 63
윤원건 (한국건설기술연구원 건설정책연구소) , 신은영 (한국건설기술연구원 건설정책연구소) , 강태경 (한국건설기술연구원 건설정책연구소)
Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC metho...
Alazzaz, F., and Whyte, A. (2014). "Uptake of Off-site Construction: benefits and Future Application." World Academy of Science, Engineering and Technology International Journal of Civil, Architectural, Structural and Construction Engineering 8(12), pp. 1148-1152.
Bae, B.Y., Kang, T.K., Shin, E.Y., and Kim, K.H. (2020). "A Study on the Policy Agenda for Activating PC Apartment using Focus Group Interview(FGI)." Journal of Korea Academy Industrial Cooperation Society, 21(12), pp. 888-895.
Blismas, N., Pasquire, C., and Gibb, A. (2006). "Benefit evaluation for off?site production in construction." Construction Management and Economics, 24(2), pp. 121-130.
Cho, B. H. (2014). "Eight Factors Affecting the Economics of Modular Construction", ARCHITECTURE(ARCHITECTURAL INSTITUTE OF KOREA), 58(05), pp. 42-46.
Gibb, A., and Isack, F. (2003). "Re-engineering through pre-assembly: client expectations and drivers." Building Research & Information, 31(2), pp. 146-160.
Hong, J., Shen, G.Q., Li, Z., Zhang, B., and Zhang, W. (2018). "Barriers to promoting prefabricated construction in China: a cost-benefit analysis." J. Clean. Prod., 172(2018), pp. 649-660.
Hwang, J.H. (2014). "Development of Integrated Management Process for Precast Concrete construction method based on BIM." MS thesis, University of Seoul.
Hwang, Y.H. (2019). "Development of hybrid PC method for apartment underground parking lot." DAELIM TECHNICAL REVIEW 2004_SUMMER, pp. 94-105.
Jun, Y.H., Bae, B.Y., and Yun, W.G. (2021). "Derivation of the construction process of Precast concrete System based on Off-Site Construction." Proceedings of the Korean Institute of Building Construction Conference, South Korea, pp. 289-290.
Kim, S.H. (2004). "Apartment basement parking lot PC conversion." SSANGYONG CONSTRUCTION TECHNOLOGY REVIEW 2004_SUMMER, pp. 32-39.
Kim, S.Y., Lee, K.H., and Song, M.J. (2014). "Development of LH 1-way PC System for Underground Parking Structures." Land and Housing Research Institute.
Kim, Y.N., and Yun, H.D. (2020). "Precast Concrete Method of Knowledge Industrial Building & Flatted Factory." ARCHITECTURE (ARCHITECTURAL INSTITUTE OF KOREA), 64(7), pp. 21-26.
Lee, J.S. (2021). "OSC role and development direction as an innovation engine." 2021 CMAK Webinar-Description of the construction industry and countermeasures in the post-coronavirus new normal era, 2021.05.26.
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., and Wang, X. (2016). "Cost analysis for sustainable off-site construction based on a multiple-case study in China." Habitat Int., 57(2016), pp. 215-222.
Noh, H.C., and Lee, G.C. (2020). "Manufacture and Site Erection of Precast Elements." ARCHITECTURE(ARCHITECTURAL INSTITUTE OF KOREA), 64(7), pp. 27-30.
Pan, W., and Sidwell, R. (2011). "Demystifying the cost barriers to offsite construction in the UK." Construction Management and Economics, 29(11), pp. 1081-1099.
Song, S.H., Park, J.Y., and Bang, J.D. (2014). "An Economic Evaluation Method on Demonstration Project of Cost-effective Long-life Housing." Proceedings of the Korean Housing Association Conference, South Korea, pp. 75-78.
Seok, J.W. (2009). "Study on PC integrated performance system application effect of apartment house underground parking lot." MS thesis, Yeungnam University.
Wuni, I.Y., and Shen, G.Q.P. (2019). "Holistic Review and Conceptual Framework for the Drivers of Offsite Construction: A Total Interpretive Structural Modelling Approach." Buildings 2019, 9(5), p. 117
Yoo, K.J,, and Oh, Y.H. (2020). "Application of Precast Concrete Construction Method in Logistics Center." ARCHITECTURE (ARCHITECTURAL INSTITUTE OF KOREA), 64(7), pp. 16-20.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.