최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.23 no.5, 2022년, pp.56 - 64
박보성 (충북대학교 건축공학과) , 김옥규 (충북대학교 건축공학과)
Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet bee...
Han, J.H. (2019). "Risk Factors to Implement CM at Risk Project." M.S. Dissertation, Department of Architectural Engineering, Hanyang University, pp. 14-44.
Kim, I.S. (2018). "Improvement Plans of VE Processes in Each Stage of a Construction Project." M.S. Dissertation, International School of Urban Sciences, University of Seoul, pp. 112-113.
Kim, M.S. (2014). "Improvement of Design VE Process Using the Quality Model by Construction Project Type." M.S. Dissertation, Department of Architectural Engineering, Namseoul University, pp. 25-29
Kim, Y. (2010). "Analysis of Performance by Case-Studies on Design VE." M.S. Dissertation, Dept. of Construction Management, Dong-A University, pp. 23-67.
Lee, C.J. (2017). "Benchmarking of Foreign General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness." M.S. Dissertation, Department of Architectural Engineering, Hanyang University, pp. 14-45.
Park, B.S. (2019). "A Study on the Bid Evaluation Method for Selecting CM at Risk Construction in Korea." M.S. Dissertation, Department of Architectural Engineering, Chungbuk National University, pp. 23-71.
Seo, H.H. (2018). "A Study on the Analysis and Improvement of Construction VE System." Ph.D. Dissertation, School of Architectural, Civil, Environmental and Energy Engineering, Kyungpook National University, pp. 58-102.
Shin, W.J. (2017). "BIM Application plan for Pre-con service delivery method and Road Map of BIM-based Design application for LH apartment projects." Journal of KIBIM, KIBIM, 7(1), pp. 81-82.
Son, M.J. (2008). "The Development of a Practicability Evaluation Model on VE Proposals using the Scenarios Planning and the Fuzzy Analytic Hierarchy Process." M.S. Dissertation, Department of Architectural Engineeringt, University of Seoul, pp. 28-29, 65-67.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.