최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.24 no.2, 2023년, pp.37 - 49
이재일 (충북대학교 토목공학과) , 정은지 (한미글로벌 글로벌사업부) , 정근채 (충북대학교 토목공학부)
In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource...
Chae, J.I., and Park, Y.B. (2008). "A Case Study on the?Throughput Improvement in the Semiconductor?Package Process." KIIE Conference 2008, KIIE, pp.?1333-1337.?
Goldratt, E.M. (1984). The Goal., North River Press.?
IBM Corp. (2019). IBM SPSS Statistics for Windows (26.0).?http://www.ibm.com?
Jung, I.S. (2018). "A Preliminary Study for Productivity?Improvement of Construction Industry based on?Big Data Analysis." Proceedings of the KCC 2018?Conference, KIISE, pp. 19-20.?
Kim H.C., Hwang, Y.K., and Kim, K.R. (2014). "Study on?the Application of Multi-skilled labors to Factory?Production Process for Securing Economic Feasibility?of Modular Unit." Korean Journal of Construction?Engineering and Management, KICEM, 15(1), pp. 11-19.?
Kim, M.J., Park, M.S., Lee, H.S., Lee, J.H., and Lee, K.P.?(2015). "Development of Manufacturing Planning for?Multi Modular Construction Project based on GeneticAlgorithm." Korean Journal of Construction Engineering?and Management, KICEM, 16(5), pp. 54-64.?
Kwon, H.J., Jeon, S.W., Lee, J.I., and Jeong, K.C. (2021).?"Development of a Simulation Model for Supply Chain?Management of Precast Concrete." Korean Journal of?Construction Engineering and Management, KICEM,?22(5), pp. 86-98.?
Lee, D.Y., Nam, S.H., Lee, J.S., Jung, D.I., Kim, K.R., and?Cho, B.H. (2019a). "Factory Production Management?of Modular Units Using MFD 2019." Journal of?the Architectural Institute of Korea Structure &?Construction, AIK, 35(6), pp. 139-146.?
Lee, H.K., Jung, W.M., and Kim, H.S. (2006). "TOC Theory?Applications for Construction Management." AIK?Conference 2006, AIK, 26(1), pp. 649-652.?
Lee, H.S., Yang, J.H., Noh, S.D., and Park, Y.J. (2019b).?"A Study on the Determination of Real Time Proper?Vehicle Input Order Considering the Bottleneck Process?of Automobile Assembly Line." Korean Journal of?Computational Design and Engineering, CDE, 24(1), pp.?30-38.?
Lee, J.I., Jeong, E.J., Kim, S.N., and Jeong, K.C. (2022).?"Development of a Simulation Model for Supply Chain?Management of Modular Construction based Steel?Bridge." Korean Journal of Construction Engineering?and Management, KICEM, 23(2), pp. 3-15?
Lee, S.Y. (2013). "Eco-friendly Construction and Activation?of Steel Structure." KSCE Jorunal of Civil and?Environmental Engineering Research, KSCE, 61(2), pp.?19-21.?
Little, J.D.C. (1961). "A Proof for the Queuing Formula:Lλ?W." Operations Research, 9(3), pp. 383-387.?
Mun, J.S., Park, S.Y., and Lee, D.H. (2016). "A Study on?the Productivity Improvement of the Dicing Blade?Production Process." Journal of Korean Society of?Industrial and Systems Engineering, 39(3), KSIE, pp.?147-155.?
Park, K.M., and Jeong, S.J. (2016). "A Study onthe?Improvement of Work Flow and Productivity in?Complex Manufacturing Line by Employing the?Effective Process Control Methods." Journal of the?Korea Academia-Industrial Cooperation Society, KAIS,?17(5), pp. 305-315.?
Rockwell Automation (2020). Arena Simulation Software?(16.00.00). http://www.rockwellautomation.com
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.