최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.24 no.5, 2023년, pp.22 - 34
김현진 (세종대학교 건축학과) , 김한수 (세종대학교 건축학과)
Predicting accurately the construction cost budget in the early stages of construction projects is crucial to support the client's decision-making and achieve the objectives of the construction project. This holds true for public construction projects as well. However, the current methods for predic...
Baccarini, D. (2005). Estimating Project Cost Contingency?- Beyond the 10% Syndrome. Conference Paper of?Australian Institute of Project Management National?Conference, Nov 9 2005. Victoria: Australian Institute?of Project Management.
Chandgude, S.E., and Sarode G.C. (2020). "To Study Cost?Prediction Analysis of Construction Project Using ANN?Model(Artificial Neural Network) SVM by Matlab."?Journal of Emerging Technologies and Innovative?Research (JETIR), JEITIR, 7(7), pp. 291-306.
Gunaydin, H.M., and Dogan, S.Z. (2004). "A Neural Network?Approach for Early Cost Estimation of Structural?Systems of Buildings." Journal of Elsevier, Elsevier,?22(7), pp. 595-602.
Han, H.D., Kim, J.H., Yoon, J.H., and Seo, J.W. (2011). "Road?Construction Cost Estimation Model in the Planning?Phase Using Artificial Neural Network." Journal of?Korean Society of Civil Engineering, Korean Society of?Civil Engineering, 31(6), pp. 829-837.
Hashemi, S.T., Ebadati, O.M., and Kaur, H. (2020). Cost?Estimation and Prediction in Construction Projects: a?Systematic Review on Machine Learning Techniques.?SN Applied Science Research Report, Review Paper.
Heo, J.Y. (2014). "Prediction of Road-Construction Cost?Using an Artificial Neural Network Method." Master?Thesis, Journal of Kang-Won University, Kang-Won?University, Kangwondo, Korea.
Hong, S.I. (2021). Recent Research Trends and?Revitalization of Machine Learning in Building?Operation and Maintenance. KICEM Research Report,?22(2).
Ji, S.H., Park, M.S., Lee, H.S., and Yoon, Y.S. (2008).?"Direction for Improving Cost Estimation and?Management of Construction Projects: Comparing to?Australian System." Korean Journal of Construction?Engineering and Management, KICEM, 9(2), pp. 170-181.
Jo, Y.H., Choi, H.J., Kim, J.W., and Yun, S.H. (2020).?"Conceotual Cost Estimate Method of Public Office?Building Structural Frame Work by Regression?Analysis." Journal of the Korea Institute of Building?Construction, KIC, 20(2), pp. 147-153.
Jung, E.H., Yeom, D.J., Kim, J.S., and Kim, Y.S. (2021).?"Development of Construction Cost Estimation Model?for Elementary, Middle and High School Facilities."?Korean Journal of Construction Engineering and?Management, KICEM, 22(3), pp. 69-78.
Kim, C.Y., and Son, J.H. (2006). "A Study on the Model?of Artificial Neural Networkfor Construction Cost?Estimation of Educational Facilities at Conceptual?Stage." Korean Journal of Construction Engineering and?Management, KICEM, 7(4), pp. 91-99.
Kim, I.K., and Park, J. (2022). "A Study on Improvement of?Construction Cost Estimation Method in the Feasibility?Study Stage of Health Facilities in ODA Project." Journal?of Korea Association of International Development and?Cooperation, KAIDEC, 14(1), pp. 99-118.
Kim, J.H., Jun, S.M., Hwang, S.H., Kim, H.K., Heo, J.M., and?Kang, M.S. (2021). "Impact of Activation Functions on?Flood Forecasting Model Based on Artificial Neural Networks." Journal of the Korean Society of Agricultural?Engineers, KSAE, 63(1), pp. 11-25.
Kim, Y.C., Yoo, W.S., and Shin, Y.S. (2017). "Application of?Artificial Neural Networks to Prediction of Construction?Safety Accidents." Journal of Korean Society of Hazard?Mitigation, KOSHAM, 17(1), pp. 7-14.
Korea Institute of Procurement. (2021). 「2022 Construction?Order Guidebook.」 Korea Institute of Procurement?(2021), pp. 1-51.
Kulkarni, P.S., Londhe, S.N., and Deo, S.N. (2017). "Artificial?Neural Networks for Construction Management:?A Review." Journal of Soft Computing in Civil?Engineering, SCCE, 1(2), pp. 70-88.
Lee, D.H. (2018). Artificial Neural Network to Improve?Learning Effectiveness of Artificial Intelligence.?Telecommunications Technology Association (TTA)?Research Report.
Lee, H.S., Jung, M.J., Park, M.S., and Son, B.S. (2010). "Cost?Estimating for Public Facilities at Early Stage Using?Functional Area Cost -Focusing on Army Barracks-"?Korean Journal of Construction Engineering and?Management, KICEM, 6(1), pp. 3-13.
Lee, J.G., Lee, H.S., Park, M.S., and Seo J.O. (2021). "Early-Stage Cost Estimation Model for Power Generation?Project with Limited Historical Data." Journal of?Emarald, Emerald, ISSN 0969-9988.
Lee, J.Y., and Lee, B.J. (2021). "Application of Artificial?Neural Network to Predict Aerodynamic Coefficients of?the Nose Section of the Missiles." Journal of The Korean?Society for Aeronautical & Space Science, KSAS, 49(11),?pp. 901-907.
Oh, S.B., and Lim, H.I. (2019). "A Study on Hidden Layer?for Neural Network Model." Proceedings of the Korea?Information Processing Society Conference, KIPS, 26(1),?pp. 467-769.
Park, H.J., Choi, S.B., and Kang, C.W. (2020). "Determination?of Input Nodes for Neural Network Model in Time?Series Data." Journal of the Korean Data Analysis?Society, KDAS, 22(3), pp. 1055-1065.
Park, M.S., Seong, K.H., Lee, H.S., Ji, S.H., and Kim, S.Y.?(2010). "Schematic Cost Estimation Method using Case-Based Reasoning: Focusing on Determining Attribute?Weight." Korean Journal of Construction Engineering?and Management, KICEM, 11(4), pp. 22-31.
Van, S.G., Le-Hoai, L., and Dang, C.N. (2019). "Predicting?Implementation Cost Contingencies for Residential?Construction Projects in Flood-Prone Areas." Journal of?Emerald, Emerald, 12(10), pp. 1097-1119.
Yoon, J.M. (2019). "Effectiveness Analysis of Credit Card?Default Risk with Deep Learning Neural Network."?Journal of Korea Money and Finance Association,?KMFA, 33(1), pp. 151-183.
해당 논문의 주제분야에서 활용도가 높은 상위 5개 콘텐츠를 보여줍니다.
더보기 버튼을 클릭하시면 더 많은 관련자료를 살펴볼 수 있습니다.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.