최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Procedia engineering, v.145, 2016년, pp.804 - 811
Abbas, A. , Din, Z.U. , Farooqui, R.
Owing to shift in global perspective and socio-economic needs, the construction industry is undertaking risky and complex projects. The complexity of construction projects requires the coordination between designer and contractor in the early stages of the projects. Little research has been performe...
Murray, M., CII best practices front end planning and alignment. 2015, Obtained online January 2016 from http://www.projectmanagement.org.za/?page=KnowSer.
Journal of Management in Engineering Griffith 17 2 69 2001 10.1061/(ASCE)0742-597X(2001)17:2(69) Alignment during preproject planning
Journal of Management in Engineering George 2008 10.1061/(ASCE)0742-597X(2008)24:2(66) Critical activities in the front-end planning process
Automation in construction Waly 12 2 139 2003 10.1016/S0926-5805(02)00047-X A virtual construction environment for preconstruction planning
Journal of Construction Engineering and Management Hwang 138 4 567 2012 10.1061/(ASCE)CO.1943-7862.0000456 Front-end planning implementation in Singapore: Status, importance, and impact
Construction Industry Institute (CII), CII Best Practices Guide: Improving Project Performance. Implementation Resource 166-3. Vol. Version 4.0. 2012: University of Texas at Austin.
Journal of Management in Engineering Mollaoglu-Korkmaz 29 1 71 2013 10.1061/(ASCE)ME.1943-5479.0000114 Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes
Journal of Construction Engineering and Management Oh 142 2 2015 10.1061/(ASCE)CO.1943-7862.0001050 Integration of the Construction Knowledge and Expertise in Front-End Planning
Procedia Engineering Son 118 37 2015 10.1016/j.proeng.2015.08.401 An Empirical Investigation of Key Pre-project Planning Practices Affecting the Cost Performance of Green Building Projects
Construction Industry Institute (CII), Pre- Project Planning Handbook. 1995, Austin, TX: Univ. of Texas at Austin.
Alshanbari, H., Impact of Pre-Construction Project Planning on Cost Savings. 2010, University of Florida.
Bosfield, R.P., Front End Planning In The Modern Construction Industry. 2012, Arizona State University.
Automation in Construction Wang 19 3 341 2010 10.1016/j.autcon.2009.12.007 A study of preproject planning and project success using ANNs and regression models
Construction Research Congress. Zolfagharian 2014 Current trends in construction site layout planning
Journal of Construction Engineering and Management El Asmar 136 8 904 2010 10.1061/(ASCE)CO.1943-7862.0000194 Quantitative methods for design-build team selection
Riley, D. and M. Horman. Effects of design coordination on project uncertainty. in Proceedings of the 9th Annual Conference of the International Group for Lean Construction (IGLC-9), Singapore. 2001. Citeseer.
Construction Management and Economics Sacks 33 1 55 2015 10.1080/01446193.2015.1029504 Safety by design: dialogues between designers and builders using virtual reality
G Edward GIBSON and R. BOSFIELD, Common Barriers to Effective Front-End Planning of Capital Projects. Construction Research Congress, ASCE, 2012: p. 2459-2468.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.