NTIS 바로가기Automation in construction, v.71 pt.2, 2016년, pp.262 - 270
Arashpour, Mehrdad (School of Property, Construction and Project Management, RMIT Univ.) , Wakefield, Ron (School of Property, Construction and Project Management, RMIT Univ.) , Abbasi, Babak (School of Business IT and Logistics, RMIT Univ.) , Lee, E.W.M. (Department of Architecture and Civil Engineering, City Univ. of Kong Kong) , Minas, James (School of Business, State Univ. of New York at New Paltz)
Abstract Off-site construction is a unique hybrid of manufacturing operations and on-site construction activities. Maximizing the production output has long been the main challenge for off-site manufacturers. Among other responses to this challenge, the use of multi-task shared resources has proved...
Constr. Manag. Econ. Blismas 24 121 2006 10.1080/01446190500184444 Benefit evaluation for off-site production in construction
Autom. Constr. Jaillon 18 239 2009 10.1016/j.autcon.2008.09.002 The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector
Autom. Constr. Nath 54 54 2015 10.1016/j.autcon.2015.03.014 Productivity improvement of precast shop drawings generation through BIM-based process re-engineering
Autom. Constr. Benjaoran 15 737 2006 10.1016/j.autcon.2005.09.007 Intelligence approach to production planning system for bespoke precast concrete products
PCI J. Belsky 59 144 2014 10.15554/pcij.03012014.144.155 Interoperability for precast concrete building models
Autom. Constr. Kim 45 163 2014 10.1016/j.autcon.2014.05.015 Automated dimensional quality assessment of precast concrete panels using terrestrial laser scanning
Autom. Constr. De Albuquerque 22 348 2012 10.1016/j.autcon.2011.09.013 A cost optimization-based design of precast concrete floors using genetic algorithms
Autom. Constr. Jaillon 39 195 2014 10.1016/j.autcon.2013.09.006 Life cycle design and prefabrication in buildings: a review and case studies in Hong Kong
J. Manag. Eng. Arashpour 040150061 2015 Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings
Autom. Constr. Sacks 19 419 2010 10.1016/j.autcon.2009.11.012 The Rosewood experiment - building information modeling and interoperability for architectural precast facades
Eng. Constr. Archit. Manag. Blismas 17 99 2010 10.1108/09699981011011357 Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap
Prod. Oper. Manag. Lim 23 1113 2014 10.1111/poms.12091 Cellular bucket brigades on U-lines with discrete work stations
Eur. J. Oper. Res. Bartholdi 168 870 2006 10.1016/j.ejor.2004.07.034 Bucket brigades on in-tree assembly networks
J. Oper. Res. Soc. Lind 54 119 2003 10.1057/palgrave.jors.2601474 Team-based reconstruction for expanding organisational ability
Autom. Constr. Arashpour 50 72 2015 10.1016/j.autcon.2014.12.002 Optimization of process integration and multi-skilled resource utilization in off-site construction
Int. J. Prod. Res. Brandimarte 44 2997 2006 10.1080/00207540500435116 Multi-item capacitated lot-sizing with demand uncertainty
Autom. Constr. Sacks 13 291 2004 10.1016/S0926-5805(03)00043-8 Parametric 3D modeling in building construction with examples from precast concrete
Autom. Constr. Dawood 12 113 2003 10.1016/S0926-5805(02)00044-4 Visualisation of a stockyard layout simulator “SimStock”: a case study in precast concrete products industry
Constr. Manag. Econ. Polat vol. 24 1185 2006 10.1080/01446190500529432 Economics of on-site vs. off-site fabrication of rebar
J. Constr. Eng. Manag. Pan 138 1331 2012 10.1061/(ASCE)CO.1943-7862.0000544 Strategies for integrating the use of off-site production technologies in house building
Constr. Econ. Build. Reza Hosseini vol. 16 18 2016 10.5130/AJCEB.v16i1.4651 Critical success factors for implementing risk management systems in developing countries
J. Archit. Eng. Boyd 19 51 2013 10.1061/(ASCE)AE.1943-5568.0000091 Off-site construction of apartment buildings
Autom. Constr. Chen 19 665 2010 10.1016/j.autcon.2010.02.011 Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization
Mullens 12 2004 9780784407547 Proceedings of the NSF Housing Research Agenda Workshop Production flow and shop floor control: Structuring the modular factory for custom homebuilding
Oztemir 2003 “Skill-driven optimization of construction operations," PhD dissertation
Autom. Constr. Liu 24 16 2012 10.1016/j.autcon.2011.12.009 Optimizing linear project scheduling with multi-skilled crews
Int. J. Proj. Manag. Arashpour 2016 10.1016/j.ijproman.2016.02.004 Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
J. Oper. Res. Soc. Azizi 64 260 2013 10.1057/jors.2012.30 An integrated approach to worker assignment, workforce flexibility acquisition, and task rotation
Adv. Eng. Inform. Goulding 26 103 2012 10.1016/j.aei.2011.09.004 Construction industry offsite production: a virtual reality interactive training environment prototype
Archit. Eng. Des. Manag. Mignone 1 2016 Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital
Arashpour 2014 FULFIL: production control system for managing workflow, quality and flexibility in construction
J. Constr. Eng. Manag. Ipsilandis 133 417 2007 10.1061/(ASCE)0733-9364(2007)133:6(417) Multiobjective linear programming model for scheduling linear repetitive projects
Prod. Oper. Manag. Andradõttir 22 1144 2013 10.1111/poms.12009 Design principles for flexible systems
Decis. Support. Syst. Shao 2013 Organizing knowledge workforce for specified iterative software development tasks
Manag. Sci. Hopp 50 83 2004 10.1287/mnsc.1030.0166 Benefits of skill chaining in serial production lines with cross-trained workers
IIE Trans. (Institute of Industrial Engineers) Hopp 36 919 2004 Agile workforce evaluation: a framework for cross-training and coordination
J. Archit. Eng. Alvanchi 18 114 2011 10.1061/(ASCE)AE.1943-5568.0000055 Off-site construction planning using discrete event simulation
Autom. Constr. Arashpour 53 13 2015 10.1016/j.autcon.2015.03.013 Autonomous production tracking for augmenting output in off-site construction
Koskela 2014 Proceedings of 22th International Group for Lean Construction Conference, June 23-27, Oslo, Norway If CPM is so bad, why have we been using it so long?
Plotnick 2009 CPM in Construction Management: McGraw-Hill Professional
IEEE Trans. Evol. Comput. Jensen 7 275 2003 10.1109/TEVC.2003.810067 Generating robust and flexible job shop schedules using genetic algorithms
Brucker vol. 3 2007
IEEE Trans. Syst. Man Cybern. Syst. Hum. Janiak 37 614 2007 10.1109/TSMCA.2007.893485 Soft due window assignment and scheduling on parallel machines
Comput. Ind. Eng. Levner 59 352 2010 10.1016/j.cie.2010.03.013 Complexity of cyclic scheduling problems: a state-of-the-art survey
Adv. Control Dyn. Syst. White 115 2012 Advances in the theory and practice of production scheduling
Moghadam 2014 Lean-MOD: An Approach to Modular Construction Manufacturing Production Efficiency Improvement
Expert Syst. Appl. Ko 38 8293 2011 10.1016/j.eswa.2011.01.013 Precast production scheduling using multi-objective genetic algorithms
Archit. Sci. Rev. Hu 50 106 2007 10.3763/asre.2007.5016 A study of resource planning for precast production
Hopp 2011 Factory physics
J. Constr. Eng. Manag. Arashpour 140 04013053 2014 10.1061/(ASCE)CO.1943-7862.0000804 Analysis of disruptions caused by construction field rework on productivity in residential projects
Autom. Constr. Akhavian 47 37 2014 10.1016/j.autcon.2014.07.007 Evaluation of queuing systems for knowledge-based simulation of construction processes
Can. J. Civ. Eng. Arashpour 41 995 2014 10.1139/cjce-2014-0199 Framework for improving workflow stability: Deployment of optimized capacity buffers in a synchronized construction production
Australas. J. Constr. Econ. Build. Arashpour 13 83 2013 A new approach for modelling variability in residential construction projects
J. Manag. Eng. Arashpour 31 04015006 2015 10.1061/(ASCE)ME.1943-5479.0000363 Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings
Autom. Constr. Mirahadi 65 102 2016 10.1016/j.autcon.2015.12.021 Simulation-based construction productivity forecast using Neural-Network-Driven Fuzzy Reasoning
J. Constr. Eng. Manag. Asce Martinez 136 3 2010 10.1061/(ASCE)CO.1943-7862.0000087 Methodology for conducting discrete-event simulation studies in construction engineering and management
J. Constr. Eng. Manag. Lucko 137 45 2011 10.1061/(ASCE)CO.1943-7862.0000244 Integrating efficient resource optimization and linear schedule analysis with singularity functions
J. Oper. Res. Soc. Zhou 64 1091 2013 10.1057/jors.2012.174 A review of methods and algorithms for optimizing construction scheduling
J. Oper. Res. Soc. Love 64 1231 2013 10.1057/jors.2013.29 Probability distribution fitting of schedule overruns in construction projects
Autom. Constr. Wongwai 20 429 2011 10.1016/j.autcon.2010.11.012 Augmented heuristic algorithm for multi-skilled resource scheduling
Eur. J. Oper. Res. Henderson 145 72 2003 10.1016/S0377-2217(02)00206-0 Solving the shortest route cut and fill problem using simulated annealing
Autom. Constr. Ko 19 907 2010 10.1016/j.autcon.2010.06.004 GA-based decision support systems for precast production planning
Autom. Constr. Cheng 29 92 2013 10.1016/j.autcon.2012.08.005 Modeling resource management in the building design process by information constraint Petri nets
Can. J. Civ. Eng. Hazini 40 382 2013 10.1139/cjce-2012-0380 A heuristic method to determine optimum degree of activity accelerating and overlapping in schedule compression
J. Oper. Res. Soc. He 64 1106 2013 10.1057/jors.2013.33 Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project
Comput. Ind. Eng. Hindi 47 91 2004 10.1016/j.cie.2004.03.002 A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem
Glover 2013 Tabu Search
Arashpour 32 2011 Economics, Business and Management Important factors influencing personnel performance of construction companies
J. Oper. Res. Soc. Brusco 62 1357 2011 10.1057/jors.2010.72 An integrated approach to shift-starting time selection and tour-schedule construction
Australas. J. Constr. Econ. Build. Arashpour 12 1 2012 Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry
Eng. Constr. Archit. Manag. Lingard 19 647 2012 10.1108/09699981211277559 Work time demands, work time control and supervisor support in the Australian construction industry: an analysis of work-family interaction
Constr. Soc. Arashpour 2013 2013 “Improving construction productivity: implications of even flow production principles,” presented at the CIB World Building Congress
Arashpour 1 2013 Research, Development and Practice in Structural Engineering and Construction (ASEA-SEC) Role of simulation in construction processes-harmony in capturing resources
Autom. Constr. Sacks 19 641 2010 10.1016/j.autcon.2010.02.010 Requirements for building information modeling based lean production management systems for construction
Arashpour 23 2010 978-1906638801 Proceedings of the 6th European Conference on Management Leadership and Governance Gaining the best value from hr in construction companies