NTIS 바로가기Automation in construction, v.95, 2018년, pp.1 - 9
Arashpour, Mehrdad (Department of Civil Engineering, Monash University) , Kamat, Vineet (Department of Civil and Environmental Engineering, University of Michigan) , Bai, Yu (Department of Civil Engineering, Monash University) , Wakefield, Ron (School of Property, Construction and Project Management, RMIT University) , Abbasi, Babak (School of Business IT and Logistics, RMIT University)
Abstract In advanced manufacturing of building elements, process integration and utilization of multi-skilled resources enhance the flexibility of production networks against variations in demand and resource availability. This research study aims to incorporate the required cost and time for cross...
Can. J. Civ. Eng. Kim 43 4 287 2016 10.1139/cjce-2015-0010 Supply chain cost model for prefabricated building material based on time-driven activity-based costing
J. Comput. Civ. Eng. Taghaddos 28 2 263 2014 10.1061/(ASCE)CP.1943-5487.0000262 Simulation-based multiagent approach for scheduling modular construction
J. Comput. Civ. Eng. Sunkpho 17 4 209 2003 10.1061/(ASCE)0887-3801(2003)17:4(209) Java inspection framework: developing field inspection support systems for civil systems inspection
J. Comput. Civ. Eng. Khalili 27 3 243 2013 10.1061/(ASCE)CP.1943-5487.0000203 IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication
Autom. Constr. Li 49 PA 163 2015 10.1016/j.autcon.2014.10.010 Proactive training system for safe and efficient precast installation
Hastak 163 2005 Construction Research Congress: Broadening Perspectives National housing research agenda for construction management and production
Constr. Manag. Econ. Lucko 32 6 575 2014 10.1080/01446193.2013.845305 Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling
J. Constr. Eng. Manag. Tommelein 125 5 304 1999 10.1061/(ASCE)0733-9364(1999)125:5(304) Parade game: impact of work flow variability on trade performance
J. Comput. Civ. Eng. Sacks 29 1 2015 10.1061/(ASCE)CP.1943-5487.0000366 Hybrid discrete event simulation and virtual reality experimental setup for construction management research
Can. J. Civ. Eng. Hegazy 39 9 968 2012 10.1139/l2012-024 Enhancing the critical path segments scheduling technique for project control
Eur. J. Oper. Res. Gnanlet 238 1 254 2014 10.1016/j.ejor.2014.03.033 Impact of productivity on cross-training configurations and optimal staffing decisions in hospitals
Int. J. Proj. Manag. Arashpour 34 7 1393 2016 10.1016/j.ijproman.2016.02.004 Analysis of interacting uncertainties in on-site and off-site activities: implications for hybrid construction
IIE Trans. Tekin 41 6 546 2009 10.1080/07408170802512586 Pooling strategies for call center agent cross-training
J. Oper. Res. Soc. Campbell 62 6 1038 2011 10.1057/jors.2010.16 A two-stage stochastic program for scheduling and allocating cross-trained workers
Eur. J. Oper. Res. Bartholdi 168 3 870 2006 10.1016/j.ejor.2004.07.034 Bucket brigades on in-tree assembly networks
Eur. J. Oper. Res. Sennott 170 2 541 2006 10.1016/j.ejor.2004.06.030 Optimal dynamic assignment of a flexible worker on an open production line with specialists
J. Oper. Res. Soc. Lapierre 55 6 589 2004 10.1057/palgrave.jors.2601708 Balancing assembly lines: an industrial case study
Comput. Oper. Res. Yang 65 139 2016 10.1016/j.cor.2015.07.007 Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment
Oper. Res. Hopp 53 5 852 2005 10.1287/opre.1050.0226 Serial agile production systems with automation
Prod. Oper. Manag. Andradõttir 22 5 1144 2013 10.1111/poms.12009 Design principles for flexible systems
Autom. Constr. Arashpour 50 72 2015 10.1016/j.autcon.2014.12.002 Optimization of process integration and multi-skilled resource utilization in off-site construction
Int. J. Comput. Integr. Manuf. Kulvatunyou 17 5 377 2004 10.1080/09511920310001607104 Integration framework of process planning based on resource independent operation summary to support collaborative manufacturing
Int. J. Protein Res. Park 43 19 3959 2005 10.1080/00207540500140799 Enterprise resource planning (ERP) operations support system for maintaining process integration
J. Constr. Eng. Manag. Gomar 128 2 103 2002 10.1061/(ASCE)0733-9364(2002)128:2(103) Assignment and allocation optimization of partially multiskilled workforce
Autom. Constr. Liu 24 16 2012 10.1016/j.autcon.2011.12.009 Optimizing linear project scheduling with multi-skilled crews
Int. J. Proj. Manag. Arashpour 35 4 647 2017 10.1016/j.ijproman.2017.02.016 Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting
J. Oper. Res. Soc. Agnihothri 54 4 410 2003 10.1057/palgrave.jors.2601535 Workforce cross-training decisions in field service systems with two job types
Gong 2011 Presented at the 2011 International Conference on Computing, Information and Control, ICCIC 2011, Wuhan A new workforce cross-training policy for a U-shaped assembly line
Autom. Constr. Wongwai 20 4 429 2011 10.1016/j.autcon.2010.11.012 Augmented heuristic algorithm for multi-skilled resource scheduling
Can. J. Civ. Eng. Arashpour 41 12 995 2014 10.1139/cjce-2014-0199 Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production
J. Comput. Civ. Eng. Azimi 26 6 681 2011 10.1061/(ASCE)CP.1943-5487.0000190 Applying basic control theory principles to project control: case study of off-site construction shops
J. Oper. Res. Soc. Azizi 64 2 260 2013 10.1057/jors.2012.30 An integrated approach to worker assignment, workforce flexibility acquisition, and task rotation
Nav. Res. Logist. Hopp 56 1 42 2009 10.1002/nav.20325 Design and control of agile automated CONWIP production lines
J. Oper. Res. Soc. Hadjinicola 61 2 342 2010 10.1057/jors.2008.186 Manufacturing costs in serial production systems with rework
J. Clean. Prod. Li 134 Part B 482 2016 10.1016/j.jclepro.2016.02.123 Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
J. Work. Learn. Abrams 22 8 522 2010 10.1108/13665621011082882 Workforce cross training: a re-emerging trend in tough times
IIE Trans. Yang 39 7 735 2007 10.1080/07408170701244687 An evaluation of worker cross training and flexible workdays in job shops
Amfiteatru Econ. Abuharris 16 8 1269 2014 The role of cross-training in reducing the level of labor turn over applied study on some hotels in Tripoli - Libya
Archit. Eng. Des. Manag. Arashpour 14 1-2 46 2018 Optimal process integration architectures in off-site construction: theorizing the use of multi-skilled resources
Araz 314 2008 IIE Annual Conference and Expo 2008, Vancouver, BC Two stage stochastic integer programming model for workforce cross training
Int. J. Protein Res. Xu 53 4 1255 2015 10.1080/00207543.2014.955923 Cross-trained workers scheduling for field service using improved NSGA-II
Comput. Oper. Res. Berman 31 2 201 2004 10.1016/S0305-0548(02)00180-6 A queueing control model for retail services having back room operations and cross-trained workers
Bo 259 2007 IEEE/WIC/ACM International Conference on Web Intelligence, WI 2007, Silicon Valley, CA Bootstrapping both product properties and opinion words from chinese reviews with cross-training
Constr. Manag. Econ. Blismas 24 2 121 2006 10.1080/01446190500184444 Benefit evaluation for off-site production in construction
Autom. Constr. Arashpour 71 262 2016 10.1016/j.autcon.2016.08.001 Off-site construction optimization: Sequencing multiple job classes with time constraints
Int. J. Protein Res. Winch 45 4 803 2007 10.1080/00207540600635144 Cyclic job scheduling in paced assembly lines with cross-trained workers
Manuf. Serv. Oper. Manag. Vairaktarakis 1 2 112 1999 10.1287/msom.1.2.112 Worker cross-training in paced assembly lines
Eur. J. Oper. Res. Brusco 247 1 46 2015 10.1016/j.ejor.2015.06.009 A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives
Int. J. Protein Res. Tiwari 40 18 4651 2002 10.1080/00207540210158014 Application of an evolutionary fuzzy system for the estimation of workforce deployment and cross-training in an assembly environment
Text. Rent. Patton 96 6 42 2013 Cross-training programs: Enhance productivity and flexibility
Int. J. Protein Res. Olivella 51 3 952 2013 10.1080/00207543.2012.693645 Task assignment considering cross-training goals and due dates
Arashpour 2017 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017 Curriculum renewal in architecture, engineering, and construction education: Visualizing building information modeling via augmented reality
IEEE Trans. Eng. Manag. Nembhard 54 3 565 2007 10.1109/TEM.2007.900793 Cross training in serial production with process characteristics and operational factors
Prod. Oper. Manag. Büke 25 7 1216 2016 10.1111/poms.12543 Cross-training with imperfect training schemes
J. Simul. Chung 2 3 162 2008 10.1057/jos.2008.6 Cross-trained versus specialized agents in an inbound call centre: a simulation-based methodology for trade-off analysis
Arashpour 2017 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017 Improving productivity, workflow management, and resource utilization in precast construction
IIE Trans. Easton 43 8 589 2011 10.1080/0740817X.2010.550906 Cross-training performance in flexible labor scheduling environments
J. Stat. Comput. Simul. Feng 84 6 1190 2014 10.1080/00949655.2013.842239 A system dynamics-based simulation model of production line with cross-trained workers
IEEE Trans. Eng. Manag. Kim 57 4 560 2010 10.1109/TEM.2010.2048905 Cross-trained staffing levels with heterogeneous learning/forgetting
Autom. Constr. Babič 19 5 539 2010 10.1016/j.autcon.2009.11.005 Integrating resource production and construction using BIM
J. Constr. Eng. Manag. Alvanchi 138 1 66 2011 10.1061/(ASCE)CO.1943-7862.0000384 Dynamics of working hours in construction
J. Constr. Eng. Manag. Arashpour 142 1 04015006 2016 10.1061/(ASCE)CO.1943-7862.0001032 Quantitative analysis of rate-driven and due date-driven construction: production efficiency, supervision, and controllability in residential projects
Autom. Constr. Leu 11 4 439 2002 10.1016/S0926-5805(01)00083-8 GA-based resource-constrained flow-shop scheduling model for mixed precast production
J. Constr. Eng. Manag. Skibniewski 135 10 965 2009 10.1061/(ASCE)0733-9364(2009)135:10(965) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms
Manag. Sci. Hopp 50 1 83 2004 10.1287/mnsc.1030.0166 Benefits of skill chaining in serial production lines with cross-trained workers
Oztemir 2003 Skill-Driven Optimization of Construction Operations, PhD Dissertation
Archit. Sci. Rev. Hu 50 2 106 2007 10.3763/asre.2007.5016 A study of resource planning for precast production
J. Civ. Eng. Manag. Negahban 18 2 253 2012 10.3846/13923730.2012.666503 A decision-making model for adoption of enterprise resource planning tools by small-to-medium size construction organizations
Autom. Constr. Arashpour 71 262 2016 10.1016/j.autcon.2016.08.001 Off-site construction optimization: Sequencing multiple job classes with time constraints
J. Manag. Eng. Tatari 24 4 198 2008 10.1061/(ASCE)0742-597X(2008)24:4(198) Performance evaluation of construction enterprise resource planning systems
Autom. Constr. Shohet 65 33 2016 10.1016/j.autcon.2016.01.008 Enterprise resource planning system for performance-based-maintenance of clinics
J. Comput. Civ. Eng. El-Anwar 30 3 2016 10.1061/(ASCE)CP.1943-5487.0000504 Innovative linear formulation for transportation reconstruction planning
IIE Trans. Hopp 36 10 919 2004 10.1080/07408170490487759 Agile workforce evaluation: a framework for cross-training and coordination
J. Comput. Civ. Eng. Siu 30 2 2016 10.1061/(ASCE)CP.1943-5487.0000498 Zero-one programming approach to determine optimum resource supply under time-dependent resource constraints
AJCEB Arashpour 12 4 1 2012 10.5130/AJCEB.v12i4.2724 Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry
Soft Comput. Mahdi Mobini 13 6 597 2009 10.1007/s00500-008-0337-5 Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
Autom. Constr. Hsie 18 7 942 2009 10.1016/j.autcon.2009.04.006 Resource-constrained scheduling for continuous repetitive projects with time-based production units
J. Oper. Res. Soc. Kher 51 5 592 2000 10.1057/palgrave.jors.2600935 Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effects
J. Oper. Res. Soc. Koh 55 3 219 2004 10.1057/palgrave.jors.2601710 MRP-controlled batch-manufacturing environment under uncertainty
Int. J. Ind. Eng. Theory Appl. Pract. Kim 13 4 357 2006 Joint economic production-shipment policy in a single-manufacturer-multiple-item system
Int. J. Comput. Methods Zhang 3 2 177 2006 10.1142/S0219876206000801 Efficient computation of multiplierless filters in embedded systems employing an optimal approximation method
Autom. Constr. Arashpour 53 13 2015 10.1016/j.autcon.2015.03.013 Autonomous production tracking for augmenting output in off-site construction
Can. J. Civ. Eng. Alvanchi 39 9 1005 2012 10.1139/l2012-087 Dynamics of workforce skill evolution in construction projects
Eur. J. Oper. Res. Olivella 248 2 462 2016 10.1016/j.ejor.2015.07.036 Calibrating cross-training to meet demand mix variation and employee absence
Int. J. Constr. Educ. Res. Hyari 6 70 2010 Optimal assignment of multiskilled labor in building construction projects
J. Constr. Eng. Manag. Srour 132 1158 2006 10.1061/(ASCE)0733-9364(2006)132:11(1158) Linear programming approach to optimize strategic investment in the construction workforce
Comput. Civ. Infrastruct. Eng. Florez 32 874 2017 10.1111/mice.12301 Crew Allocation System for the Masonry Industry
J. Constr. Eng. Manag. Hegazy 126 414 2000 10.1061/(ASCE)0733-9364(2000)126:6(414) Algorithm for scheduling with multiskilled constrained resources
Constr. Manag. Econ. Tam 19 207 2001 10.1080/01446190150505126 Genetic algorithm model in optimizing the use of labour
Autom. Constr. Long 18 499 2009 10.1016/j.autcon.2008.11.005 A genetic algorithm-based method for scheduling repetitive construction projects
Autom. Constr. Gouda 81 411 2017 10.1016/j.autcon.2017.03.007 Optimal crew routing for linear repetitive projects using graph theory
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.