NTIS 바로가기한국건축시공학회지 = Journal of the Korea Institute of Building Construction, v.20 no.6, 2020년, pp.497 - 504
김주용 (Graduate School, Kyonggi University) , 정영철 (Graduate School, Kyonggi University) , 김광희 (Department of Architectural Engineering, Kyonggi University)
In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower...
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
Ministry of Land, Infrastructure and Transport [Internet]. Seoul (Korea): Korea Statistical Information Service; 2020-[cited 2020 Jul 27]. Available from: http://kosis.kr
Choi CH. A study on the risk analysis and measures of reduction through tower crane accidents cases [master's thesis]. [Seoul (Korea)]: Hanyang University; 2017. 57 p.
Ministry of Land, Infrastructure and Transport [Internet]. Seoul (Korea): Ministry of Land, Infrastructure and Transport; 2020-[cited 2020Jul 27]. Available from:http://www.molit.go.kr
Kim YU. Problems and improvement schemes for unmanned tower crane accident through case analysis at construction site [master's thesis]. [Seoul (Korea)]: Chung-Ang University; 2018. 124 p.
Aneziris ON, Papazoglou IA, Mud ML, Damen M, Kuiper J, Baksteen H, Ale BJ, Bellamy LJ, Hale AR, Bloemhoff A, Post JG, Oh J. Towards risk assessment for crane activities. Safety Science. 2008 Jun;46(6):872-84. https://doi.org/10.1016/j.ssci.2007.11.012
Kwon OM. Deduction of accident cause for tower-crane using fmea method [master's thesis]. [Seoul (Korea)]: Hanyang University; 2015. 60 p.
Neitzel RL, Seixas NS, Ren KK. A review of crane safety in the construction industry. Applied Occupational and Environmental Hygiene. 2001 Nov;16(12):1106-17.
Shapira A, Simcha M. AHP-based weighting of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management. 2009 Apr;135(4):307-18. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(307)
Cho YR. Importance evaluation of the safety accident factors of tower crane using analytic hierarchy process [master's thesis]. [Suwon (Korea)]: Kyonggi University; 2017. 95 p.
Song PY. A study on improvement of safety management through analysis of tower crane disaster at construction site [master's thesis]. [Busan (Korea)]: Pukyong University; 2018. 104 p.
Chi HL, Chen YC, Kang SC, Hsieh SH. Development of user interface for tele-operated cranes. Advanced Engineering Informatics. 2012 Nov;26(3):641-52. https://doi.org/10.1016/j.aei.2012.05.001
Cho GT, Cho YG, Kang HS. The analytic hierarchy process. Seoul (Korea): Donghun; 2003. 311 p.
Kim YG. Importance rankings of prospective owners' selection factors on the each room's finishing for minus option of apartment by ahp [master's thesis]. [Suwon (Korea)]: Kyonggi University; 2020. 69 p.
Korea Occupational Safety and Health Agency. Technical guidelines for the installation, assembly and dismantling of tower cranes. Ulsan (Korea): Korea Occupational Safety and Health Agency. 2011. p. 1-19.
Korea Occupational Safety and Health Agency [Internet]. Ulsan (Korea): Korea Occupational Safety and Health Agency; 2020-[cited 2020 Jul 27]. Available from: http://www.kosha.or.kr/kosha/data/construction.do
Korea Occupational Safety and Health Agency. Safety work guide to prevent death of construction machinery and equipment. Ulsan (Korea): Korea Occupational Safety and Health Agency. 2018. p. 1-97.
Lee HC. Collective decision making. Seoul (Korea): Sejong; 2000. 186 p.