NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.22 no.3, 2021년, pp.79 - 90
이승준 (서울시립대학교 건축공학과) , 차용운 (한국건설기술연구원) , 한상원 (서울시립대학교 건축공학과) , 현창택 (서울시립대학교 건축공학과)
In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judici...
Construction Economy Research Institute Of Korea (CERIK) (2020). "Top 60 Tasks for Construction and Housing Regulatory Reform." Korea.
Cho, S. (2016). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works' Prolonged Construction Period." Master thesis, Kyonggi Univ., Korea.
Cho, D. (2017). "Institutional Improvement Plans for Indirect Cost Issues Due to Public Works Prolonged Construction Period." Master thesis, Chung-Ang Univ., Korea.
Choi, M. (2010). "A Study on the Technique of Calculation of Construction Period Extension-Oriented Overhead Costs." Master thesis, Chung-Ang Univ., Korea.
Lee, S. (2018). "Introduction to a Rating Method for the Estimation of the Additional Overhead Expenses incurred by Delayed Schedules." Master thesis, Univ. of Seoul., Korea.
Hyun, H. (2013). "Contract Management and Claims." Cplus International, Koea.
Jeong, K. (2016). "A Model to Estimate Additional Indirect Costs for Extended Construction Times." Doctoral thesis, Dongguk Univ., Korea.
Jeong, K., and Lee, J. (2018). "Application of Accrual Basis for Calculation of Prolongation Cost in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 111-120.
Kim, B., Seong, G., Bae, I., Bang. H., and Choi, H. (2019a). "An Design of Analyzing Process by Construction Extension of Time." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 104-113.
Kim. D. (2019b). "A Study on the Legal Issue Due to Time Extension of Public Construction Work." Doctoral thesis, Kwangwoon Univ., Korea.
Kim, K. (2018). "An Estimation Model for the Additional Overhead Cost of Extended Duration of Construction by using the Case Based Reasoning (CBR) Method." Master thesis, Univ. of Seoul, Korea.
Koo, H. (2017). "A Selection Logic of Policy Making: Rationality, Constraint, and Symbol." Korean Journal of Public Administration, SNU-KIPA, 55(4). pp. 273-306.
Korea Cost Accounting Association (2010). "A Study on the Improvement of Air Extension Cost Items." KCAA, Korea.
Korea National Railway (2017). "Indirect Charge Response Manual." KNR, Korea.
Kim, W. (2017). "Analysis and Implications of Wage Gap between Large and Small Company." I-KIET Industry and Economic Issues, KIET, 28, pp. 1-12.
Lee, H. (2018). "A Risk Assessment Model for Delay Management Protocol in the Contract Conditions of International Construction Projects." Doctoral thesis, Ajou University, Korea.
Sung, K. (2013). "A Study on the Legal Issues in Petitions for Indirect Costs, etc., in a Public Construction Contract." Master thesis, Kwangwoon Univ., Korea.
Shin, Y. (2012). "Improvement of the Calculation Method on the Additional Costs due to Construction Delay." Doctoral thesis, Dongguk Univ., Korea.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.