NTIS 바로가기KSCE Journal of Civil and Environmental Engineering Research = 대한토목학회논문집, v.43 no.1, 2023년, pp.91 - 98
엄세호 (성균관대학교 글로벌스마트시티융합전공) , 차기춘 (성균관대학교 글로벌스마트시티융합전공) , 박선규 (성균관대학교 건설환경공학부) , 박승희 (성균관대학교 건설환경공학부) , 박종호 (성균관대학교 리질리언트에코스마트시티)
Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Dat...
Al-Bahar, J. F. (1989). Risk management in construction projects:?A systemic analytical approach for contractors, Ph.D. Dissertation,?University of California Berkeley, Berkeley, California, USA.
Choi, J. W. (2015). An analysis on regional differences of major?delay factors in overseas architectural projects, Master Dissertation,?Hanyang University, Seoul, Korea (in Korean).
kakao (2020). Kakao hangul analyzer III, Available at: https://github.com/kakao/khaiii (Accessed: October 18, 2022).
Kang, H. B. and Yi, J. S. (2018). "An analysis of public text data in?construction disaster cases using Word2Vec-based data visualization." Autumn Annual Conference of AIK, 2018, Architectural?Institute of Korea, Vol. 38, No. 2, pp. 567-570 (in Korean).
Kang, L. S., Kim, C. H. and Kwak, J. M. (2002). "Analysis for the?importance of risk factors through the project life cycle." Journal?of the Architectural Institute of Korea Structure & Construction,?Vol. 17, No. 8, pp. 103-110 (in Korean).
Kim, J. S. (2022a). Analysis of project delay using big data, Master?Dissertation, Hanyang University, Seoul, Korea (in Korean).
Kim, E. H. (2022b). Automatic classification on the work breakdown?structure of apartment construction projects: A machine learning approach, Master Dissertation, Sungkyunkwan University, Seoul,?Korea (in Korean).
Kim, J. S. and Kim, B. S. (2019). "Characteristics analysis of seasonal?construction site fall accident using text mining." Korean Journal?of Construction Engineering and Management, Vol. 20, No. 3,?pp. 113-121 (in Korean).
Kim, K. H., Kim, K. H., Lee, Y. S. and Kim, J. J. (2008). "A study?about influence of risk factors in relation to construction cost?increase and schedule delay on the reinforced concrete construction."?Journal of the Architectural Institute of Korea Structure &?Construction, Vol. 24, No. 5, pp. 165-172 (in Korean).
Lee, J. H. and Yi, J. S. (2017). "Predicting project's uncertainty risk?in the bidding process by integrating unstructured text data and?structured numerical data using text mining." Applied Sciences,?Vol. 7, No. 11, pp. 1-15.
Lee, J. S., Kim, D. Y., Lee, C. J., Lee, J. H. and Han, S. H. (2018).?"A research for clustering of conflict in public construction?project." Korean Journal of Construction Engineering and?Management, Vol. 19, No. 2, pp. 61-72 (in Korean).
Marzouk, M. and Enaba, M. (2019). "Text analytics to analyze and?monitor construction project contract and correspondence." Automation in Construction, Vol. 98, pp. 265-274.
Mikolov, T., Chen, K., Corrado, G. and Dean, J. (2013). Efficient?estimation of word representations in vector space, Available at:?https://arxiv.org/abs/1301.3781 (Accessed: October 18, 2022).
Park, E. L. and Cho, S. Z. (2014). "KoNLPy: Koreannatural?language processing in Python." Annual Conference on Human?and Language Technology, pp. 133-136 (in Korean).
Park, K. C. and Kim, H. K. (2021). "Analysis of seasonal importance?of construction hazards using text mining." Journal of the Korean?Society of Civil Engineers, KSCE, Vol. 41, No. 3, pp. 305-316 (in?Korean).
Seo, D. H. (2019). Text mining with python, bjpublic, Seoul, Korea?(in Korean).
Shin, Y. J. and Chi, S. H. (2014). "Tacit knowledge informatization?from text-based construction data." Annual Conference of KICEM,?2014, Korean Journal of Construction Engineering and Management, pp. 31-34 (in Korean).
Smilkov, D., Thorat, N., Nicholson, C., Rief, E., Viegas, F. and?Wattenberg, M. (2016). Embedding projector: Interactive visualization and interpretation of embeddings, Available at: https://arxiv.org/abs/1611.05469 (Accessed: October 18, 2022).
Son, B. Y. and Lee, E. B. (2019). "Using text mining to estimate?schedule delay risk of 13 oshore oil and gas EPC case studies?during the bidding process." Energies, Vol. 12, No. 10, pp. 1-25.
Wang, G., Liu, M., Cao, D. and Tan D. (2020). "Identifying highfrequency-low-severity construction safety risks: An empirical?study based on official supervision reports in Shanghai." Engineering,?Construction and Architectural Management, Vol. 29, No. 2, pp.?940-960.
Yang, H. S. (2020). Comparison of recognition on the risks affecting?schedule delays and cost overruns in overseas civil construction?projects, Master Dissertation, Hanyang University, Seoul, Korea?(in Korean).
Yang, S. W. and Lim, H. C. (2021). "Semantic network analysis on?the research trends of construction accident." Journal of the?Architectural Institute of Korea, Vol. 37, No. 6, pp. 231-236 (in?Korean).
Yoon, Y. S., Suh, S. W., Park, M. S. and Jang, M. H. (2008).?"Construction process based schedule risk management system."?Construction Engineering and Management, Vol. 9, No. 4, pp.?101-110 (in Korean).
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.