최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건축시공학회지 = Journal of the Korea Institute of Building Construction, v.22 no.4, 2022년, pp.347 - 358
정희웅 (Department of Architectural Engineering, Dongseo University)
In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and app...
Kang IS. Improving 4D modeling system through a comparative analysis of 4D functions for construction management. Journal of the Architectural Institute of Korea Structure & Construction. 2002 Oct;18(10):85-92.
Kim HN. Development of drawing & specification management system using 3D object-based product model. Journal of the Korea Construction Management Association. 2000 Sep;1(3):124-34.
Shin JW. Introducing information-oriented work process modeling method for effective design management in design collaboration. Journal of the Architectural Institute of Korea Structure & Construction. 2006 Aug;22(8):181-8.
Kim IH, BIM/VDC : A Desirable Direction of Application of Virtual Design Construction in Korea. Architecture & Society. 2008 Dec;8(14):80-7. https://archisociety.kr/?categoryconstruct
Lee HM. (A) study on the development of construction information integrated system to build BIM [dissertation]. [Gwangju (Korea)]: Chonnam national university; 2008. 130 p.
Wilson AJ. Experiments in probabilistic cost modelling. London: Routledge; 2005. p. 169-80.
Singh S. Cost model for reinforced concrete beam and slab structures in buildings [dissertation]. [Kent Risge (Singapore)]: School of building and estate mgmt; 1990. 14 p.
Kim HJ. Smart city development using BIM information model based on artificial intelligence [dissertation]. [Seoul (Korea)]: University of seoul International School of Urban Sciences; 2017. 4 p.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.