최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of KIBIM = 한국BIM학회논문집, v.14 no.1, 2024년, pp.22 - 29
이승원 (한양대학교 건축공학과) , 엄익철 (한양대학교 건축공학과) , 함남혁 (한양사이버대학교 건축도시건설공학부) , 김재준 (한양대학교 건축공학부)
BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction sta...
Aibinu, A. A., Carter, S., Francis, V., Vaz-Serra, P. (2020).?Request for Information Frequency and Their Turnaround?Time in Construction Projects: A Data-analytic Study,?Built Environment Project and Asset Management, 10(1), pp. 1-15.
Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler,?R. C., Jelodari, N., Roshdi Laleh, S. (2022). Internet of?Things (IoT), Building Information Modeling (BIM), and?Digital Twin (DT) in Construction Industry: A Review,?Bibliometric, and Network Analysis. Buildings, 12(10), 1503.
Bryde, D., Broquetas, M., Volm, J. M. (2013). The Project?Benefits of Building Information Modelling (BIM), International?Journal of Project Management, 31(7), pp. 971-980.
Chen, L., Luo, H. (2014). A BIM-based Construction Quality?Management Model and Its Applications, Automation in?Construction, 46, pp. 64-73.
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff,?S. (2013). BIM Implementation Throughout the UK Construction?Project Lifecycle: An Analysis, Automation in?Construction, 36, pp. 145-151.
Ham, N. H., Yuh, O. K. (2023). Performance Analysis and?Assessment of BIM-based Construction Support with?Priority Queuing Policy, Buildings, 13(1), 153.
Ham, N., Moon, S., Kim, J. H., Kim, J. J. (2020). Optimal BIM?Staffing in Construction Projects Using a Queueing?Model, Automation in Construction, 113, 103123.
Higgins Jr, D., Fryer, S. (2013). Using the Forward Thinking?Index to Measure Request for Information Submission Effectiveness. 49th ASC Annual International Conference?Proceedings, San Luis Obispo, CA., pp. 10-13.
Huh, S. H., Ham, N., Kim, J. H., Kim, J. J. (2023). Quantitative?Impact Analysis of Priority Policy Applied to BIM-based?Design Validation, Automation in Construction, 154, 105031.
Kim, D. S., Choi, H. M., Kim, J. H. (2014). A Proposal of BIM?Work Process to Support Construct-ability Analysis from?Practitioners Viewpoint, Journal of the Korea Institute of?Building Construction, 14(6), pp. 561-569.
Kim, H. J., Yoo, M. Y., Kim J. J., Choi, C. S. (2017). Performance?Analysis of BIM Labor Using Case Analysis,?Journal of the Korea Institute of Building Construction, 7(3), pp. 31-39.
Kim, H. S. (2010). Revealing Issues and Prospects of Domestic?Construction by Analysis of BIM Case Studies, Construction, 54(1), pp. 65-69.
Kim, M. K, Kang, C., Koh, I, L. (2022). A Basic Study on?Establishing Information System of Each Stage to Adopt?the Current Architecture Process Based BIM -Focusing?on the Drawing and Form Composition Information-,?Journal of the Korea Academia-Industrial Cooperation Society, 23(4), pp. 531-540.
Kim, W. J., Park, J. H., Cha, Y, O., Hyun, C, T., Han, S, W.?(2016). Development of Checklist for BIM Model Requirements?in Construction Phase, Korean Journal of Construction?Engineering and Management, 20(1), pp. 22-31.
Lau, S. E. N., Zakaria, R., Aminudin, E., Saar, C. C., Yusof,?A., Wahid, C. M. F. H. C. (2018). A Review of Application?Building Information Modeling (BIM) During Preconstruction?Stage: Retrospective and Future Directions,?IOP Conference Series: Earth and Environmental Science, 143(1), 012050.
Lee, G., Park, H. K., Won, J. (2012). D3 City Project-?Economic Impact of BIM-assisted Design Validation,?Automation in Construction, 22, pp. 577-586.
Li, X., Xu, J., Zhang, Q. (2017). Research on Construction?Schedule Management Based on BIM Technology, Procedia?Engineering, 174, pp. 657-667.
Liu, Z., Osmani, M., Demian, P., Baldwin, A. (2015). A BIMaided?Construction Waste Minimisation Framework,?Automation in Construction, 59, pp. 1-23.
Messner, J. (2023). BIM Project Execution Planning Guide,?Vesion 3.0. Penn State Computer Integrated Construction?Research Program. https://psu.pb.unizin.org/bimprojectexecutionplanning/.
Morales, F., Herrera, R. F., Rivera, F. M. L., Atencio, E., Nunez,?M. (2022). Potential Application of BIM in RFI in Building?Projects, Buildings, 12(2), 145.
Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P.,?Ruparathna, R. (2023). A Review of Construction Management?Challenges and BIM-based Solutions: Perspectives?from the Schedule, Cost, Quality, and Safety?Management, Asian Journal of Civil Engineering, 24(1), pp. 353-389.
Sompolgrunk, A., Banihashemi, S., Mohandes, S. R. (2023).?Building Information Modelling (BIM) and the Return on?Investment: A Systematic Analysis, Construction Innovation, 23(1), pp. 129-154.
Sulankivi, K., Kahko?nen, K., Makela, T., Kiviniemi, M. (2010). 4D-BIM for Construction Safety Planning, Proceedings?of W099-special Track 18th CIB World Building Congress, 2010, pp. 117-128.
Toyin, J. O., Mewomo, M. C. (2022). Overview of BIM Contributions?in the Construction Phase: Review and Bibliometric?Analysis, Journal of Information Technology in?Construction, 28, pp. 500-514.
Walasek, D., Barszcz, A. (2017). Analysis of the Adoption?Rate of Building Information Modeling [BIM] and its?Return on Investment [ROI], Procedia Engineering, 172, pp. 1227-1234.
Wanberg, J., Harper, C., Hallowell, M. R., Rajendran, S. (2013).?Relationship between Construction Safety and Quality?Performance, Journal of Construction Engineering and?Management, 139(10), 04013003.
Whitlock, K., Abanda, F. H., Manjia, M. B., Pettang, C., Nkeng,?G. E. (2018). BIM for Construction Site Logistics Management,?Journal of Engineering, Project, and Production?Management, 8(1), 47.
Won, J., Lee, G. (2016). How to Tell if a BIM Project is?Successful: A Goal-driven Approach, Automation in?Construction, 69, pp. 34-43.
Yoon, S, W., Kim, S, A., Choi, J, M., Kem, D, Y. (2015). A?Proposal for Using BIM Model Created in Design to?Construction Phase - Case Study on Preconstruction?Adopting BIM -, Journal of Korean Institute of BIM, 5(4), pp. 1-10.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
출판사/학술단체 등이 한시적으로 특별한 프로모션 또는 일정기간 경과 후 접근을 허용하여, 출판사/학술단체 등의 사이트에서 이용 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.